My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-121 Resolution Accepting the Proposals from Burdick Plumbing & Heating Co, Inc. for COVID-19 Remedial Protection Measures
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-121 Resolution Accepting the Proposals from Burdick Plumbing & Heating Co, Inc. for COVID-19 Remedial Protection Measures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 11:12:29 AM
Creation date
9/14/2020 11:12:27 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-121
Res Ord Title
R2020-121 Resolution Accepting the Proposals from Burdick Plumbing & Heating Co, Inc. for COVID-19 Remedial Protection Measures
Department
City Manager
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location: Out building Kitchen <br /> Description: Kitchen sink with sprayer(no options with sprayer) <br /> We propose to furnish & install Water coolers, flush vales & faucets as detailed below. <br /> > Due to high demand of touchless options access the United States we can expect long lead <br /> times on most materials needed for this project. <br /> > All touchless flush valves & faucets will be battery powered &will require periodic maintenance <br /> > Upon completion all sinks & lavatories will have one temperature of water <br /> > All work to be performed by a licensed plumber in accordance with state & local codes <br /> > All work to be performed between hours of M-F 7 a.m. — 3:30 p.m. <br /> > All existing water coolers, faucets, flush valves etc. that are removed, can be left on site for the <br /> city to reclaim, or Burdick can remove & discard of materials. Any other options could incur <br /> additional cost. <br /> > Removal of drywall, block, brick etc. as needed to gain access to plumbing behind wall & <br /> modify plumbing as needed <br /> > All water cooler installs will potentially require electrical re-work, patching & painting of drywall, <br /> block, brick etc. See Exclusions below. <br /> > Some locations may also require stud framing. See Exclusions below <br /> > We will coordinate all work with COD employees.as required for each facility <br /> We exclude the following: <br /> > Taxes <br /> > Overtime <br /> > Any unforeseen condition that may require additional work such as, but not limited to: condition <br /> of existing drain & or water piping. Water shut down due to existing valves not holding or <br /> valves that may need replaced etc. <br /> > electrical re-work, patching & painting of drywall, block, brick etc. <br /> > Stud /framing work <br /> > Stainless covers that may be used to cover holes in wall <br /> > Expedited freight charges <br /> > Should doors & building buildings be locked &we cannot gain access after coordinating, <br /> we may need to charge additional labor for down time. <br /> Respectfully Submitted, <br /> Doug Conway <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.