Laserfiche WebLink
Building: Raw Water Building <br /> Location:15f floor <br /> Description: Swap out 1 faucet & 1 water closet flush valve <br /> $ 9 iso <br /> We propose to furnish & install Water coolers, flush vales &faucets as detailed below. <br /> > Due to high demand of touchless options access the United States we can expect long <br /> lead times on most materials needed for this project. <br /> > All touchless flush valves &faucets will be battery powered & will require periodic maintenance <br /> > Upon completion all sinks & lavatories will have one temperature of water <br /> > All work to be performed by a licensed plumber in accordance with state & local codes <br /> > All work to be performed between hours of M-F 7 a.m. —3:30 p.m. <br /> > All existing water coolers, faucets, flush valves etc. that are removed, can be left on site for the <br /> city to reclaim, or Burdick can remove & discard of materials. Any other options could incur <br /> additional cost. <br /> > Removal of drywall, block, brick etc. as needed to gain access to plumbing behind wall & <br /> modify plumbing as needed <br /> > All water cooler installs will potentially require electrical re-work, patching & painting of drywall, <br /> block, brick etc. See Exclusions below. <br /> > Some locations may also require stud framing. See Exclusions below <br /> > We will coordinate all work with COD employees.as required for each facility <br /> We exclude the following: <br /> > Taxes <br /> > Overtime <br /> > Any unforeseen condition that may require additional work such as, but not limited to: condition <br /> of existing drain & or water piping. Water shut down due to existing valves not holding or <br /> valves that may need replaced etc. <br /> > blectrical re-work, patching & painting of drywall, block, brick etc. <br /> > Stud /framing work <br /> > Stainless covers that may be used to cover holes in wall <br /> Expedited freight charges <br /> > Should doors & building buildings be locked &we cannot gain access after coordinating, <br /> we may need to charge additional labor for down time. <br /> Page 12 <br />