My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-123 Resolution Authorizing the Execution of an Agreement with the Norfolk Southern Railway Company for a Water Main Crossing, City Project 2020-10
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-123 Resolution Authorizing the Execution of an Agreement with the Norfolk Southern Railway Company for a Water Main Crossing, City Project 2020-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 11:17:59 AM
Creation date
9/14/2020 11:17:58 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-123
Res Ord Title
R2020-123 Resolution Authorizing the Execution of an Agreement with the Norfolk Southern Railway Company for a Water Main Crossing, City Project 2020-10
Department
Public Works
Approved Date
9/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�comNORFOLK SOUTHERN <br /> PIPE DATA SHEET <br /> CARRIER PIPE CASING PIPE <br /> CONTENTS TO BE HANDLED Water <br /> MAX. ALLOWABLE OPERATING PRESSURE 80 psi <br /> NOMINAL SIZE OF PIPE 8„ 2411 <br /> OUTSIDE DIAMETER 9.05" 2411 <br /> INSIDE DIAMETER 8.39" 23.25" <br /> WALL THICKNESS 0.33" 0.375" <br /> WEIGHT PER FOOT 27.7 Ib/ft 94.6 Ib/ft <br /> MATERIAL Ductile Iron Steel <br /> PROCESS OF MANUFACTURE Cast Welded <br /> SPECIFICATION AWWA 151 ASTM A-139 <br /> GRADE OR CLASS Class 52 Grade B <br /> (Specified Minimum Yield Strength) <br /> TEST PRESSURE 120 psi <br /> TYPE OF JOINT Restrained Gasket Welded <br /> TYPE OF COATING Asphaltic None <br /> DETAILS OF CATHODIC PROTECTION None None <br /> DETAILS OF SEALS OR PROTECTION AT See Attached <br /> END OF CASING <br /> CHARACTER OF SUBSURFACE MATERIAL See Soil Report See Soil Report <br /> APPROXIMATE GROUND WATER LEVEL See Soil Report See Soil Report <br /> SOURCE OF INFORMATION ON See Soil Report See Soil Report <br /> SUBSURFACE CONDITIONS p p <br /> Proposed method of installation (refer to NSCE-8 Specification): <br /> ❑� Bore and jack <br /> ❑ Jacking <br /> ❑ Tunneling (with Tunnel Liner Plate) <br /> ❑ Directional Bore/Horizontal Direction Drilling—Method A <br /> ❑ Directional Bore/Horizontal Direction Drilling—Method B <br /> ❑ Open Cut —All installations directly under any track must be designed as a bored installation. Open <br /> cut installations will be considered on a case-by-case basis by Norfolk Southern's Division <br /> Superintendent at the time of installation. <br /> ❑ Other(Specify): <br /> Last Revised:113018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.