My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-137 Resolution Authorizing Proposal with Illinois State Water Survey for Hydrologic, Sediment and Nutrient Monitoring Upper Sangamon River Watershed
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-137 Resolution Authorizing Proposal with Illinois State Water Survey for Hydrologic, Sediment and Nutrient Monitoring Upper Sangamon River Watershed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:47 PM
Creation date
10/12/2020 1:01:00 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-137
Res Ord Title
R2020-137 Resolution Authorizing Proposal with Illinois State Water Survey for Hydrologic, Sediment and Nutrient Monitoring Upper Sangamon River Watershed
Department
Public Works
Approved Date
10/5/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Objectives <br /> The overall objective of this proposal is to provide hydrologic, suspended sediment,and nutrient <br /> monitoring at three sites in the Upper Sangamon River watershed. This monitoring data will provide data <br /> that will be used by the city of Decatur to develop a watershed management plan to protect the drinking <br /> water supply to the city and local communities and industry. <br /> Project Tasks <br /> To accomplish the project objectives,the following tasks will be undertaken. <br /> Task L Collect hydrologic,stage/discharge, data at monitoring stations <br /> At all three stations,bi-weekly, a manual stage reading will be collected, as well as other site <br /> condition observations. Stream discharge rating curves that were developed by ISWS prior to 2008 for the <br /> Friends Creek bridge at Rt 48(ISWS#102)and Long Creek at Twin Bridge Rd. (ISWS#101)will be <br /> verified and updated with several manual discharge measurements made over a wide range of stages. <br /> Task 2. Collect suspended sediment and nutrient samples at monitoring stations. <br /> Bi-weekly suspended sediment,nitrate-N and total phosphorus samples will be collected by a <br /> field technician. Suspended sediment will be collected using a depth integrated method when conditions <br /> allow. Samples will be delivered and analyzed at the ISWS Public Service Laboratory in Champaign, <br /> Illinois. <br /> Task 3. Collect turbidity,pH, and temperature at monitoring stations. <br /> At all three stations, during each visit, in-situ turbidity,electrical conductivity and temperature <br /> data will be collected using equipment supplied by the City of Decatur. The City of Decatur will also <br /> supply all necessary calibration consumables. <br /> Deliverables <br /> The deliverables for this project are the data described in the above tasks. Hydrologic, suspended <br /> sediment, and nutrient data collected at each of the monitoring stations will be processed, computed, and <br /> compiled. Data will be maintained in a database at the ISWS and provided quarterly to the city of <br /> Decatur, IL and their designated consultant,Northwater Consulting. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.