My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2020-172 Resolution Authorizing Redevelopment Agreement-City of Decatur, Illinois and InnovaFeed
COD
>
City Clerk
>
RESOLUTIONS
>
2020
>
R2020-172 Resolution Authorizing Redevelopment Agreement-City of Decatur, Illinois and InnovaFeed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2021 11:53:44 AM
Creation date
12/8/2020 3:40:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2020-172
Res Ord Title
R2020-172 Resolution Authorizing Redevelopment Agreement-City of Decatur, Illinois and InnovaFeed
Department
Legal
Approved Date
12/7/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
companies reasonably satisfactory to the City, and shall name the City as a <br /> coinsured. All such policies shall contain a provision that the same will not be <br /> cancelled or modified without a thirty(30)day written notice to the City. <br /> 2.14 Lien Waivers. <br /> All contracts for construction of the Project shall provide that all contractors and <br /> subcontractors shall furnish contractor's affidavits in the form provided by state statute and <br /> that waiver of liens be required for all payments made. <br /> 2.15 Rights of Inspection. <br /> During construction of the Project,the City or its designee shall have the right at any time <br /> and from time to time to enter upon the Project for the purposes of inspection with fourteen <br /> (14)day written notice or as mutually agreed to by the Parties. Inspection by the City of <br /> the Project shall not be construed as a representation by the City that there has been <br /> compliance with the Construction Plans or any building or life safety codes adopted by the <br /> City; or that the Project will be or is free of faulty materials or workmanship, or a waiver <br /> of any right the City or any other party may have against the Developer or any other party <br /> for noncompliance with the Construction Plans,Preliminary Plans, building or life safety <br /> codes or any other ordinances of the City or the terms of this Agreement. <br /> 2.16 Highway Access. <br /> All arrangements for curb cuts and street access on highways, streets and roadways must <br /> be made by the Developer with the applicable jurisdiction. The City makes no <br /> representations whatsoever with respect to the allowance,approval or permits of curb cuts <br /> and street access with respect to the Project or Project Site; however,the City shall make <br /> reasonable efforts to assist in obtaining curb cut and street access allowance,approvals and <br /> permits. <br /> 2.17 Enterprise Zone. <br /> Developer shall apply for Enterprise Zone benefits through the Economic Development <br /> Corporation of Decatur and Macon County seeking a five-year property tax abatement on <br /> the incremental increase in property taxes generated by the Project and a waiver of State <br /> and local sales taxes on the purchase of those eligible materials used in the Project. The <br /> City shall make reasonable efforts to assist Developer in obtaining the above listed benefits <br /> from the Economic Development Corporation of Decatur and Macon County. <br /> 2.18 Sewer Construction. <br /> If needed and requested by Developer and upon Developer completing on-site pre- <br /> treatment, City agrees to construct a gravity sewer that shall connect Developer's <br /> manufacturing plant to the City's wastewater collection system at an estimated cost of <br /> $1.25 million dollars. If the Developer confirms the need to construct the gravity sewer, <br /> the City commits to construct and the Developer agrees to contribute to City the sum of <br /> Two Hundred Thousand Dollars(US$200,000)for this sewer construction which shall be <br /> paid to the City upon completion and certification of the sewer.Developer will provide the <br /> City with a surety bond, letter of credit or cashier's check guaranteeing the Two Hundred <br /> Thousand Dollars(US$200,000)contribution upon confirmation by the Developer of the <br /> need to construct the gravity sewer. The sewer shall be of sufficient size and capacity to <br /> receive the expected and reported sanitary and process waste flows of the Project. Design, <br />
The URL can be used to link to this page
Your browser does not support the video tag.