My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-11 Resolution to Appropriate Motor Fuel Tax Funds to Pay the Engineering Services Agreement to Improve the Center Street Bridge Over Stevens Creek, SN: 058-3061 City Project 2019-04
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-11 Resolution to Appropriate Motor Fuel Tax Funds to Pay the Engineering Services Agreement to Improve the Center Street Bridge Over Stevens Creek, SN: 058-3061 City Project 2019-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:46:38 PM
Creation date
2/2/2021 4:02:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-11
Res Ord Title
R2021-11 Resolution to Appropriate Motor Fuel Tax Funds to Pay the Engineering Services Agreement to Improve the Center Street Bridge Over Stevens Creek, SN: 058-3061 City Project 2019-04
Department
Public Works
Approved Date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Municipality L Name <br /> O Illinois Department <br /> City of Decatur C of Transportation C WHKS&Co <br /> O <br /> Township A <br /> L N Address <br /> Preliminary Engineering U 3695 6t'Street <br /> Frontage, Suite A <br /> County A And L City <br /> G Construction Guidance T <br /> Macon E Agreement A Springfield <br /> Section C For N State <br /> Motor Fuel Tax Funds <br /> 19-00904-00-BR y T Illinois <br /> THIS AGREEMENT is made and entered into this /St- day of Pe I �_ between the above Local <br /> Agency(LA)and Consultant(ENGINEER)and covers certain professional engineering services in connection with the <br /> improvement of the above SECTION, Motor Fuel Tax Funds, allotted to the LA by the State of Illinois under the general <br /> supervision of the State Department of Transportation, hereinafter called the"DEPARTMENT",will be used entirely or in part <br /> to finance ENGINEERING services as described under AGREEMENT PROVISIONS. <br /> Section Description <br /> Name Center Street(FAU 7374)over Steven's Creek-Bridge Replacement <br /> Route FAU 7374 Length 500.00 FT( .095 Miles) (Structure No. 058-3414 ) <br /> Termini Center Street-As necessary to tie bridge approaches into existing roadway. <br /> Description: <br /> Center Street-Removal and replacement of existing bridge structure including necessary approach roadway work. <br /> Agreement Provisions <br /> The Engineer Agrees, <br /> 1. To perform or be responsible for the performance of the following engineering services for the LA in connection with the <br /> proposed improvement herein before described, and checked below: <br /> a. ❑ Make such detailed surveys as are necessary for the preparation of detailed roadway plans. <br /> b. ❑ Make stream and flood plain hydraulic surveys and gather high water data,and flood histories for the preparation of <br /> detailed bridge plans. <br /> c. ❑ Make or cause to be made such soil surveys or subsurface investigations including borings and soil profiles n <br /> analyses thereof as may be required to furnish sufficient data for the design of the proposed improvement. Such <br /> investigations are to be made in accordance with the current requirements of the DEPARTMENT. <br /> d. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be required to <br /> furnish sufficient data for the design of the proposed improvement. <br /> e. ❑ Prepare Army Corps of Engineers Permit, Division of Water Resources Permit, Bridge waterway sketch and/or <br /> Channel Change sketch, Utility plan and locations and Railroad Crossing work agreements. <br /> f. ❑ Prepare Preliminary Bridge Design and Hydraulic Report, (including economic analysis of bridge or culvert types) <br /> and high water effects on roadway overflows and bridge approaches. <br /> g. ❑ Make complete general and detailed plans, special provisions, proposals and estimates of cost and furnish the LA <br /> with five(5)copies of the plans,special provisions, proposals and estimates. Additional copies of any or all <br /> documents,if required, shall be furnished to the LA by the ENGINEER at his actual cost for reproduction. <br /> h. ❑ Furnish the LA with survey and drafts in quadruplicate of all necessary right-of-way dedications, construction <br /> easements and borrow pit and channel change agreements including prints of the corresponding plats and staking <br /> as required. <br /> NOTE: Four Copies to be submitted to the Regional Engineer <br /> Printed 1/9/2021 Page 1 of 5 BLR 05511(Rev, 11/06) <br />
The URL can be used to link to this page
Your browser does not support the video tag.