t — ID°©
<br /> m
<br /> k F ,n4, t
<br /> ELECTRIC SERVICE AGREEMENT
<br /> EXNI51TA-Standard ftylarld
<br /> Issued,October 26,2021
<br /> This offer is presented to CITY OF DECATUR("Customer")by ILLINOIS POWER MARKETING D/B/A HOMETIFLO ENERGY
<br /> ("Suppller") and represents a price for Customer's full requirement retail power("Retail Power") needs at the service
<br /> locations)listed in Table 2,each service location referred to as an("Account*).Upon acceptance,this offer will become
<br /> Exhibit A of Supplier's Electric Service Agreement Terms and Conditions(Agreement'),a copy of which is attached, By
<br /> signing this Exhibit A,Customer Is authorizing Supplier to enroll each Account with the Utility("Lttrlity`)rioted in Table 1a
<br /> Tablo i
<br /> Initial to Select Teme
<br /> Q-01501757
<br /> 1
<br /> 54
<br /> 97
<br /> 6Qgr »DT Ilescember 2021
<br /> December 2021
<br /> T a 12422 iecmter 2t2
<br /> 2
<br /> Pe Product Quantity 1 1
<br /> ON AON- O
<br /> F
<br /> AK
<br /> Percent Energy )» 046 $0,04 $0.44
<br /> 909
<br /> 46
<br /> NA X/ADistribution Losses(/ wh) $000244 $0,04185
<br /> $0,0
<br /> Transco ( )(jkvVh)t asTr } sThru
<br /> An (/ ): $ooa9 $444x316
<br /> �
<br /> Gape urge U ato
<br /> Pa -Thru
<br /> RPS rge h): A N/A
<br /> Grass Receipts(/k ): N/A
<br /> N/A',
<br /> Voluntary REG Charge OeWhY N/A /A
<br /> -Voluntary RK Quantity(); N/A N/A
<br /> Utility: i I - I— ,
<br /> Ameren Illinois
<br /> Settlement Zone: AMILAEM.IL
<br /> Reglional Transmission Organ (RTO). MISO
<br /> Brolker/Ovinsukant(if Week,N/A): CQi Associates LLC
<br /> Percent Energy and Index EneW. if applicable in Table 1,the Percent Energy Price shall apply to the Percent Product
<br /> Quantity elected at the time of execution(Vercent Energy").Such Percent Energy represents a percentage of Customer's
<br /> full requirements energy in any and all hours of operation.Index Energy,if any,is the quantity of metered usage during any
<br /> hour of delivery that exceeds the Percent Energy("Index Energy")and is calculated by subtracting the sura of all the Percent
<br /> Energy each hour from the total hourly-metered energy.The hourly price for Index Energy(the"Index Energy price")will
<br /> equal the ATO Day Ahead Locational Marginal Price for the Utility Settlement,Zone("DA LMP").If,during the Term of this
<br /> Agreement,the DA LMP ceases to exist,then its replacement Index shall be used for the remaining term of this Agreement,
<br /> l On an hourly basis,all Percent Energy kilowatt-hour deliveries will be metered before any Index Energy kilowatt-hour
<br /> deliveries, if applicable,the Energy Price Adder will be applied to all metered kilowatt-hours,
<br /> The Percent Energy Price and the Index Energy Price include charges for energy,scheduling and load forecasting associated
<br /> with the delivery of Percent Energy and index Energy.The Percent Energy Price and Index Energy Price do not Include
<br /> charges for distribution energy losses,transmission/Network Integrated Transmission Service Charges (NITS), ancillary
<br /> services,capacity,RPS,Gross Receipts,or Voluntary RECs,nor do they apply to any charges assessed by the Utility,all of
<br /> which are the responsibility of Customer,including,but not limited to the following:charges for services under the Utility's
<br /> applicable delivery service tariffs and riders,facilities charges,taxes(either billed by the Utility or customer self-assessed)
<br /> and other Utility charges, including but not limited to fuel, environmental, or decommissioning charges, as may be
<br /> applicable from time to time.On-Peak-and Off-Peak pricing,if applicable,shall be applied for such periods as described by
<br /> the RTO,
<br /> Standard Hybrid Page l of 14 Confidential Document-See Sec.R
<br /> CMT-00029 Standard Hybrid Contract 2 Term Version.07,23 2021
<br />
|