Laserfiche WebLink
suet <br /> WATER TANK MAINTENANCE CONTRACT <br /> This Contract entered into by and between the City of Decatur,whose business address is 1 Gary <br /> K Anderson Plaza, Decatur, IL 62523 (hereinafter referred to as"the Owner") and Utility Service Co., <br /> Inc., whose business address is 535 General Courtney Hodges Boulevard, P O Box 1350, Perry, GA <br /> 31069(hereinafter referred to as"the Company"). <br /> Therefore, in consideration of the mutual promises contained herein and other valuable consideration, <br /> the receipt and sufficiency of which are hereby acknowledged by the Owner and the Company, the <br /> parties agree as follows: <br /> The Owner agrees to engage the Company to provide the professional service needed to maintain its <br /> 1,000,000 gallon water storage tank located at 3635 South Franklin Street, Decatur, IL 62523 <br /> (hereinafter"tank"). <br /> 1. Company's Responsibilities. This Contract outlines the Company's responsibility for the <br /> care and maintenance of the above described water storage tank. Care and maintenance include the <br /> following: <br /> A. The Company will annually inspect and service the tank. The tank and tower will be <br /> thoroughly inspected to ensure that the structure is in a sound,watertight condition. <br /> B. Biennially, beginning with the first washout/inspection, the tank will be completely <br /> drained and cleaned to remove all mud, silt, and other accumulations that might be <br /> harmful to the tank or its contents. After cleaning is completed, the interior will be <br /> thoroughly inspected and disinfected prior to returning the tank to service; however, the <br /> Owner is responsible for draining and filling the tank and conducting any required testing <br /> of the water. A written report will be mailed to the Owner after each inspection. <br /> C. The Company shall furnish engineering and inspection services needed to maintain <br /> and repair the tank and tower during the term of this Contract. The repairs include: steel <br /> parts, expansion joints, water level indicators, sway rod adjustments, and manhole <br /> covers/gaskets. <br /> D. The Company will clean and repaint the interior and/or exterior of the tank at such <br /> time as complete repainting is needed. The need for interior painting is to be determined <br /> by the thickness of the existing liner and its protective condition. When interior <br /> repainting is needed, procedures as outlined in A.W.W.A.-D102 specifications for <br /> cleaning and coating of potable water tanks will be followed. Only material approved for <br /> use in potable water tanks will be used on any interior surface area. The need for <br /> exterior painting is to be determined by the appearance and protective condition of the <br /> existing paint. At the time the exterior requires repainting, the Company agrees to paint <br /> the tank with the same color paint and to select a coating system which best suits the <br /> site conditions, environment, and general location of the tank. When painting is needed, <br /> all products and procedures will be equal to, or exceed the requirements of the State of <br /> Page 1 of 7 <br /> ©2020 Utility Service Co.,Inc. <br /> Rev.09/20 <br />