SCHEDULE A <br /> Scope of Work <br /> YEAR 1 (2021) <br /> Mixinq System <br /> 1. Install a PAX PWM 250/255 mixing system and control center <br /> Repairs <br /> 1. Install two (2) access ladder cable safety climbs <br /> 2. Welding repairs to the overflow to stop leaking ingress into the overflow pipe. <br /> 3. Minor touch up to exterior and interior areas where coatings are damaged. <br /> YEAR 4(2024) <br /> Exterior Specifications <br /> 1. All exterior surfaces must be pressure washed with a minimum of 4,000 P.S.I. washer to remove <br /> any surface contamination. <br /> 2. All rusted areas must be Hand/Power tool cleaned per SSPC-SP2, SP3 cleaning methods. <br /> 3. All rusted or bare areas must be spot primed with a rust inhibitive metal primer. <br /> 4. One(1)full intermediate coat of a Tnemec compatible Series coating shall be applied to <br /> complete exterior surfaces(100%). <br /> 5. One(1)full finish coat of a Tnemec Series 700 coating shall be applied to <br /> complete exterior surfaces(100%). <br /> 6. Re-trace Logo. <br /> Page 6 of 7 <br /> ©2020 Utility Service Co., Inc. <br /> Rev.09/20 <br />