Ends Department Affidavit of Availability
<br /> of Transportation For the Letting of 5/24/2021
<br /> ' Bureau of Construction
<br /> 2300 South Dirksen Parkway/Room 322 Instructions: Complete this form by either typing or using black ink. (Letting date)
<br /> Authorization to Bid"will not be issued unless both sides of this form are
<br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work.
<br /> art I. Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or
<br /> rejected. Ina joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most
<br /> 'recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE.
<br /> 1 2 3 4 Awards Pending
<br /> ontract Number 20-038 20-027 74A11 72M54 74916
<br /> ontract With Burdick Spfld Airport IDOT [DOT ]DOT
<br /> Estimated Completion Date 12/1/2021 5/1/21 12/1/2021 12/1/2021 11/1/21
<br /> total Contract Price 69,658.00 1,420,200.00 744,813.00 527,978.00 372,278.00 Accumulated Totals
<br /> ncompleted Dollar Value if Firm is the Prime
<br /> Contractor 340,000.00 744,813.00 527,978.00 372,278.00 1,985,069.00
<br /> ncompleted Dollar Value if Firm is the
<br /> ubcontractor 69,658.001 69,658.00
<br /> 2,054,727.00
<br /> I
<br /> art 11. Awards Pending and Uncompleted Work to be done with your own forces.
<br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated
<br /> subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your
<br /> company. If no work is contracted,show NONE. Totals
<br /> arthwork 229.00 20,000.00 20,229.00
<br /> ortland Cement Concrete Paving 30,000.00 30,000.00
<br /> HMA Plant Mix 0.00
<br /> MA Paving 8,000.00 30,000.00 38,000.00
<br /> Clean&Seal Cracks/Joints 372,278.00 372,278.00
<br /> ggregate Bases&Surfaces 143000.00 14,000.00
<br /> ighway,R.R.and Waterway Structures 50,000.00 50,000.00
<br /> Drainage 20,000.00 20,000.00
<br /> lectrical 0.00
<br /> iandscaping
<br /> over and Seal Coats 0.00
<br /> oncrete Construction 19,658.00 26,000.00 323,852.00 497,978.00 867,488.00
<br /> 9,000.00 9,000.00
<br /> Fencing 0.00
<br /> uardrail 0.00
<br /> ainting 0.00
<br /> Signing 0.00
<br /> old Milling,Planning&Rotomilling 53000.00 5,000.00
<br /> Mobilization 43,000.00 43,000.00
<br /> avement Markings(Paint) 0.00
<br /> ther Construction 0.00
<br /> 0.00
<br /> 0.00
<br /> otals 69,658.00 35,229.00 463,852.00 527,978.00 372,278.00 1,468,995.00