Laserfiche WebLink
. 1�,, Affidavit of Availability <br /> low De�met For the Letting of 5/24/2021 <br /> of Tra (Letting date) <br /> Bureau of Construction <br /> 2300 South Dirksen Parkway/Room 322 <br /> Springfield, Illinois 62764 Instructions: Complete this form by either typing or using black ink. <br /> "Authorization to Bid"will not be issued unless both sides of this form are <br /> [artI. Work Under Contract completed in detail. Use additional forms as needed to list all work. <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> ejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE. <br /> 1 2 3 4 Awards Pending <br /> ontract Number 20-014 74757 1135 21-004 <br /> ontract With New Berlin UCM Carlinville White Construction <br /> stimated Completion Date 6/1/21 12/1/2021 12/31/20 11/1/21 <br /> Total Contract Price 2,880,000.00 1,529,790.00 755,000.00 1,138,587.00 Accumulated Totals <br /> ncompleted Dollar Value if Firm is the Prime <br /> ontractor 360,550.00 100.00 534,430.00 7,647,265.00 <br /> Uncompleted Dollar Value if Firm is the <br /> Subcontractor 808,000.00 4,956,148.00 <br /> 12,603,413.00 <br /> kart Il. Awards Pending and Uncompleted Work to be done with your own forces. <br /> ' List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated <br /> Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your <br /> company. If no work is contracted,show NONE. Totals <br /> Earthwork 100,000.00 50,000.00 311,429.00 <br /> ortland Cement Concrete Paving 1,513,249.00 <br /> MA Plant Mix 0.00 <br /> MA Paving 113,000.00 <br /> lean&Seal Cracks/Joints 372,278.00 <br /> Aggregate Bases&Surfaces 23,300.00 491,050.00 <br /> ighway,R.R.and Waterway Structures 91,000.00 874,000.00 <br /> rainage 104,550.00 422,550.00 912,200.00 <br /> Electrical 0.00 <br /> over and Seal Coats 0.00 <br /> Concrete Construction 100.00 135,592.00 263,150.00 5,1185560.00 <br /> andscaping 10,000.00 19,000.00 <br /> encing 16,002.00 16,002.00 <br /> Guardrail 0.00 <br /> ainting 0.00 <br /> igning 0.00 <br /> Cold Milling,Planning&Rotomilling 5,000.00 <br /> obilization 63,000.00 <br /> Pavement Markings(Paint) 0.00 <br /> ther Construction(Non spi waste) 0.00 <br /> 10,000.00 10,000.00 <br /> 0.00 <br /> otals 224,550.00 100.00 201,594.00 800,000.00 0.00 9,818,768.00 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center. <br /> Page 7 of 14 <br /> Printed 5/20/2021 BC 57(Rev.08/17/10 <br />