My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-106 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for Concrete and Brick Street Rehabilitation, City Project 2021-11
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-106 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for Concrete and Brick Street Rehabilitation, City Project 2021-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 2:41:46 PM
Creation date
6/9/2021 5:27:32 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-106
Res Ord Title
R2021-106 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for Concrete and Brick Street Rehabilitation, City Project 2021-11
Department
Public Works
Approved Date
6/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ilrtois Department Check Sheet for Recurring Special Provisions <br /> Transportation <br /> Local Public Agency County_ Section Number <br /> The Following Recurring Special Provisions Indicated By An"X"Are Applicable To This Contract And Are Included By Reference: <br /> Recurring Special Provisions <br /> Check Sheet# Page No. <br /> 1 ❑ Additional State Requirements for Federal-Aid Construction Contracts 97 <br /> 2 ❑ Subletting of Contracts(Federal-Aid Contracts) 100 <br /> 3 ❑ EEO 101 <br /> 4 ❑ Specific EEO Responsibilities Non Federal-Aid Contracts 111 <br /> 5 ❑ Required Provisions-State Contracts 116 <br /> 6 ❑ Asbestos Bearing Pad Removal 122 <br /> 7 ❑ Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 123 <br /> 8 ❑ Temporary Stream Crossings and In-Stream Work Pads 124 <br /> 9 [❑ Construction Layout Stakes Except for Bridges 125 <br /> 10 ❑ Construction Layout Stakes 128 <br /> 11 ❑ Use of Geotextile Fabric for Railroad Crossing 131 <br /> 12 ❑ Subsealing of Concrete Pavements 133 <br /> 13 ❑ Hot-Mix Asphalt Surface Correction 137 <br /> 14 ❑ Pavement and Shoulder Resurfacing 139 <br /> 15 ❑ Patching with Hot-Mix Asphalt Overlay Removal 140 <br /> 16 ❑ Polymer Concrete 142 <br /> 17 ❑ PVC Pipeliner 144 <br /> 18 ❑ Bicycle Racks 145 <br /> 19 ❑ Temporary Portable Bridge Traffic Signals 147 <br /> 20 Reserved 149 <br /> 21 ❑ Nighttime Inspection of Roadway Lighting 150 <br /> 22 ❑ English Substitution of Metric Bolts 151 <br /> 23 ❑ Calcium Chloride Accelerator for Portland Cement Concrete 152 <br /> 24 ❑ Quality Control of Concrete Mixtures at the Plant 153 <br /> 25 ❑ Quality Control/Quality Assurance of Concrete Mixtures 161 <br /> 26 ❑ Digital Terrain Modeling for Earthwork Calculations 177 <br /> 27 Reserved 179 <br /> 28 ❑ Preventive Maintenance-Bituminous Surface Treatment(A-1) 180 <br /> 29 Reserved 186 <br /> 30 Reserved 187 <br /> 31 Reserved 188 <br /> 32 ❑ Temporary Raised Pavement Markers 1$9 <br /> 33 ❑ Restoring Bridge Approach Pavements Using High-Density Foam 190 <br /> 34 ❑ Portland Cement Concrete Inlay or Overlay 193 <br /> 35 ❑ Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 197 <br /> 36 ❑ Longitudinal Joint and Crack Patching 200 <br /> 37 ❑ Concrete Mix Design-Department Provided 202 <br /> Printed 04/14/21 Page 1 of 2 BLR 11300(Rev.01/05/21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.