My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-114 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Preliminary Design Services for the Oakland and Grand Area Sewer Separation Study, City Project 2021-01
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-114 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Preliminary Design Services for the Oakland and Grand Area Sewer Separation Study, City Project 2021-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 3:13:28 PM
Creation date
6/22/2021 2:36:35 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-114
Res Ord Title
R2021-114 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Preliminary Design Services for the Oakland and Grand Area Sewer Separation Study, City Project 2021-01
Department
Public Works
Approved Date
6/21/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ACOExhibit A-1 <br /> AECOM 312 938 0300 tel <br /> 303 East Wacker Drive 312 373 6800 fax <br /> Suite 1400 <br /> Chicago,IL 60601 <br /> www.aecom.com <br /> May 17, 2021 <br /> Paul Caswell, PE <br /> City Engineer <br /> City of Decatur Public Works Department <br /> #1 Gary K Anderson Plaza-3rd Floor <br /> Decatur, Illinois 62523 <br /> Regarding: Basin 5 and 6 Sewer Separation Study <br /> Dear Mr. Caswell: <br /> AECOM Technical Services, Inc. (AECOM) is providing this scope of work(Scope)for the above- <br /> referenced project. This Scope encompasses AECOM's engineering services for the subject project. <br /> Note that a detailed breakdown of task costs and a schedule is included in this Scope. <br /> Background <br /> The City is currently under Administrative Consent Order (ACO) by the United States Environmental <br /> Protection Agency (USEPA). The ACO requires a reduction in basement backups within the City's <br /> combined and sanitary sewer system, as well as the elimination of all unauthorized Combined Sewer <br /> Overflows (CSOs) and Sanitary Sewer Overflows (SSOs). <br /> In order to demonstrate compliance with the ACO, the City was required to submit a Sewer Collection <br /> System Alternatives Analysis (SCSAA). In partnership with AECOM, the SCSAA (and subsequent <br /> revisions)were submitted on April 12, 2016, November 4, 2016, and November 30, 2017. <br /> As a part of this work, Basins 5 and 6 were identified as a critical area that required substantial <br /> improvements in order to reduce basement backups and meet the requirements of the USEPA's <br /> ACO. The SCSAA recommended partial sewer separation and construction of relief sewers to reduce <br /> backups. However, the Sanitary District of Decatur will not approve the relief sewers, since they will <br /> cause a flow increase into their system. Therefore, the City would like to pursue, as much as <br /> possible, complete sewer separation within Basin 5/6. <br /> Additional evaluation and study are required in order to provide the basis of design, which needs to <br /> be performed prior to preliminary and final design of the project. <br /> SCOPE OF WORK <br /> Our scope of work will be as follows: <br /> Task 1: SITE VISIT AND KICK-OFF MEETING <br /> The first order of work on this project will be to schedule and conduct a kick-off meeting with the City <br /> of Decatur, as well as to perform a site visit with City staff. The purpose of the meeting is to: <br /> • Establish lines of communication <br /> • Discuss and confirm overall project approach <br /> • Review scope and identify any potential problems <br /> • Review existing drainage conditions within Basins 5/6, as well as downstream areas that will <br /> be impacted by the proposed sewer separation <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.