Laserfiche WebLink
ACOExhibit A-1 <br /> AECOM 312 938 0300 tel <br /> 303 East Wacker Drive 312 373 6800 fax <br /> Suite 1400 <br /> Chicago,IL 60601 <br /> www.aecom.com <br /> May 17, 2021 <br /> Paul Caswell, PE <br /> City Engineer <br /> City of Decatur Public Works Department <br /> #1 Gary K Anderson Plaza-3rd Floor <br /> Decatur, Illinois 62523 <br /> Regarding: Basin 5 and 6 Sewer Separation Study <br /> Dear Mr. Caswell: <br /> AECOM Technical Services, Inc. (AECOM) is providing this scope of work(Scope)for the above- <br /> referenced project. This Scope encompasses AECOM's engineering services for the subject project. <br /> Note that a detailed breakdown of task costs and a schedule is included in this Scope. <br /> Background <br /> The City is currently under Administrative Consent Order (ACO) by the United States Environmental <br /> Protection Agency (USEPA). The ACO requires a reduction in basement backups within the City's <br /> combined and sanitary sewer system, as well as the elimination of all unauthorized Combined Sewer <br /> Overflows (CSOs) and Sanitary Sewer Overflows (SSOs). <br /> In order to demonstrate compliance with the ACO, the City was required to submit a Sewer Collection <br /> System Alternatives Analysis (SCSAA). In partnership with AECOM, the SCSAA (and subsequent <br /> revisions)were submitted on April 12, 2016, November 4, 2016, and November 30, 2017. <br /> As a part of this work, Basins 5 and 6 were identified as a critical area that required substantial <br /> improvements in order to reduce basement backups and meet the requirements of the USEPA's <br /> ACO. The SCSAA recommended partial sewer separation and construction of relief sewers to reduce <br /> backups. However, the Sanitary District of Decatur will not approve the relief sewers, since they will <br /> cause a flow increase into their system. Therefore, the City would like to pursue, as much as <br /> possible, complete sewer separation within Basin 5/6. <br /> Additional evaluation and study are required in order to provide the basis of design, which needs to <br /> be performed prior to preliminary and final design of the project. <br /> SCOPE OF WORK <br /> Our scope of work will be as follows: <br /> Task 1: SITE VISIT AND KICK-OFF MEETING <br /> The first order of work on this project will be to schedule and conduct a kick-off meeting with the City <br /> of Decatur, as well as to perform a site visit with City staff. The purpose of the meeting is to: <br /> • Establish lines of communication <br /> • Discuss and confirm overall project approach <br /> • Review scope and identify any potential problems <br /> • Review existing drainage conditions within Basins 5/6, as well as downstream areas that will <br /> be impacted by the proposed sewer separation <br /> 1 <br />