Laserfiche WebLink
�R11r1oiS DAffidavit of Availability <br /> E'paen For the Letting of 6/16/2021 <br /> of Transportation (Letting date) <br /> Bureau of Construction Instructions: Complete this form by either typing or using black ink. <br /> 2300 South Dirksen Parkway/Room 322 'Authorization to Bid"will not be issued urdess both sides of this form are <br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work. <br /> Part L Work Under Contract <br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or <br /> rejected. Ina joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most <br /> recent engineers or owners estimate.and must include work subcontracted to others. If no work is contracted,stow NONE. <br /> 1 2 3 4 Awards Pending <br /> Contract Number MOT 74757 Local MFT 2021 Johns Hill IDOT 91603 IDOT 74A52 <br /> Helghb thood <br /> Contract With UCM City of Decatur Romano Company UCM IDOT <br /> Estimated Completion Date 12/22 12/21 10/21 8121 <br /> Total Contract Price 183,351.00 1,120,512.69 1,387,922.75 268,740.00 148,468.15 Accumulated Totals <br /> Uncompleted Dollar Value if Firm is the <br /> Prime Contractor 392,179.44 148,468.15 1,443,144.36 <br /> Uncompleted Dollar Value if Firm Is the <br /> Subcontractor 183,351.00 1,387,922.75 268,740.00 3,360,804.85 <br /> Total Value of All Work 4,803,949.21 <br /> Part 11. Awards Pending and Uncompleted Work to be done with your own forces. <br /> List below the uncompleted dollar value ofwork for each contract and awards pending to be completed with your own forces.All work Accumulated <br /> Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your <br /> company. If no work is contracted,show NONE. Totals <br /> Earthwork 0.00 <br /> Portland Cement Concrete Paving 0.00 <br /> HMA Plant Mix 0.00 <br /> HMA Paving 260,786.53 899,509.35 2,924,709.68 <br /> Clean&Seal Cracks/Joints 0.00 <br /> Aggregate Bases&Surfaces 91,800.00 42,220.15 190,322.65 <br /> Highway,R.R.and Waterway Structures 0.00 <br /> Drainage 0.00 <br /> Electrical 0.00 <br /> Cover and Seat Coats 106,248.00 106,248.00 <br /> Concrete Construction 30,000.00 <br /> Landscaping 0.00 <br /> Fencing 0.00 <br /> Guardrail 0.00 <br /> Painting 0.00 <br /> Underground Utilities 0.00 <br /> Cold Milling,Planning&Rotomilling 232,653.75 232,653.75 <br /> Demolition 0.00 <br /> Pavement Markings(Paint) 0.00 <br /> Other concoction(FOR) 0.00 <br /> Stabilization 183,351.00 163,959.651 717,673.65 <br /> CIR 268,740.001 428,216.00 <br /> Totals 183,351.00 260,788.53 1,387,922.75 268,740.00 148,468.15 4,629,823.73 <br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will <br /> result in non-issuance of an'Authorization To Bid' This form has been approved by the State Fortes Management Center. <br /> Printed 6/14/2021 Page 3 of 14 BC 57(Rev.08/17/10 <br />