Laserfiche WebLink
Operations Special Capital Project Estimate Design and Construction <br /> CJ\J Homewood, IL <br /> Southern Region East Harrison Ave New Crossing and removal of ADM private crossing <br /> Labor $50,650 <br /> Location: Decatur Material $30,231 <br /> Company Name: Illinois Central Railroad Company Other $355,404 <br /> Subdivision Name: PEORIA Total Capital Cost $436,285 <br /> Mile Post: 0.83 PW Material $0 <br /> State: IL Donation $0 <br /> Survey Network Number: TOTAL PROJECT COST $436,285 <br /> Track Network Number: Created By: NW BURWELL <br /> Signal Network Number. Revised By: NW BURWELL <br /> Buy American Certification Required? Yes Created Date: June 30,2020 <br /> Agency: CN-US-Outside Companies&Individuals(OC&I) Date Revised: February 2,2021 <br /> Labor Additive Type: Agency/CN Approved Status: <br /> Description GANG SIZE DAYS MANDAYS PRICE TOTAL <br /> LABOR <br /> Unload/Distribute Material 5 2 10 $330 $3,300 <br /> Construct Track 8 1 8 $330 $2,640 <br /> Surfacing 3 3 9 $330 $2,970 <br /> Welding 2 1 2 $330 $660 <br /> Install Crossings 7 1 7 $330 $2,310 <br /> Remove Crossing Surface panels from ADM private c 7 1 7 $350 $2,450 <br /> TOTAL DIRECT LABOR MD: 43 $14,330 <br /> Description TOTAL <br /> MATERIAL <br /> New Rail $3,734 <br /> Field Welding $449 <br /> Track Spikes $86 <br /> Rail Anchors $188 <br /> Minor OTM $2,809 <br /> Track Ties $7,288 <br /> Ballast $1,061 <br /> Crossing Materials $11,249 <br /> Subtotal New/Capitalized Material $26,864 <br /> TOTAL DIRECT MATERIAL $26,864 <br /> Description UM QTY PRICE TOTAL <br /> OTHER <br /> Engineering <br /> Total Engineering $0 <br /> Real Estate <br /> Total Real Estate $0 <br /> Grading <br /> Total Grading $0 <br /> Contractor Track Construction <br /> Mobilization/Demobilization(Track Construction) LS 1 $10,000 $10,000 <br /> Total Contractor Track Construction $10,000 <br /> Utilities <br /> Total Utilities $0 <br /> Signal and Communications <br /> Total Signal and Communications EST AMT 1 $300,000 $300,000 <br /> Bridge&Structures <br /> Total Bridge&Structures $0 <br /> Hauling/Disposal <br /> Offsite Disposal of Debris LS 1 $2,000 $2,000 <br /> Total Hauling/Disposal $2,000 <br /> Miscellaneous <br /> Per Diem(BMWE Labor) MD 43 $87 $3,741 <br /> Contingency SUM 10% $396,622 $39,663 <br /> Total Miscellaneous $43,404 <br /> TOTAL OTHER $355,404 <br /> Description UM QTY PRICE TOTAL <br /> Page 1 <br />