My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Co., Inc. for the 2021 Storm Drainage Improvement Project City Project 2021-30
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Co., Inc. for the 2021 Storm Drainage Improvement Project City Project 2021-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 9:18:43 AM
Creation date
7/20/2021 5:25:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-128
Res Ord Title
R2021-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Co., Inc. for the 2021 Storm Drainage Improvement Project City Project 2021-30
Department
Public Works
Approved Date
7/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> THIS CONTRACT, made and entered into this 19'h day of July, 2021, by and between the <br /> ' City of Decatur, Illinois, hereinafter called "Owner", and Entler Excavating Co., Inc., hereinafter <br /> called the"Contractor". <br /> ' WITNESSETH: <br /> That for and in consideration of the payments, covenants, and agreements stated herein, the <br /> Contractor and Owner agree as follows: <br /> 1. The Contractor shall perform and complete in a Good and Workmanlike Manner all <br /> Work required in connection with "2021 STORM DRAINAGE IMPROVEMENT <br /> PROJECT, CITY PROJECT 2021-30", all in strict accordance with the Contract <br /> ' Documents, including any and all Addenda prepared by the City Engineer, with <br /> specifications and drawings are made a part of this Contract; and in strict compliance <br /> with the Contractor's Bid Proposal and the other Contract Documents herein <br /> ' mentioned, which are a part of the Contract; and the Contractor shall do everything <br /> required by this Contract and the other documents constituting a part thereof. <br /> ' 2. Payments are to be made to the Contractor by the Owner in accordance with and <br /> subject to the provisions embodied in the documents made a part of this Contract, or <br /> as prescribed by law. <br /> 3. Work under this Contract shall commence on the date specified in the written Notice <br /> to Proceed from the Owner to the Contractor. Upon receipt of said Notice, the <br /> ' Contractor shall diligently and continuously prosecute and substantially complete all <br /> Work under this Contract. <br /> ' 4. A Completion Date is in effect for this project in accordance with Section 108 of <br /> the Illinois Department of Transportation, Standard Specifications for Road and <br /> Bridge Construction. The Completion Date for this project is November 15, <br /> 2021. <br /> 5. This Contract consists of the following component parts, herein defined as the <br /> ' Contract Documents, all of which are as full a part of this Contract as if herein set out <br /> verbatim, or if not attached, as if hereto attached: <br /> ' Advertisement for Bids General Conditions <br /> Information for Bidders Special Conditions <br /> Bid Proposal Standard Specifications <br /> ' Performance Bond Project Drawings <br /> Non-Collusion Affidavit Special Provisions <br /> Contract (This Instrument) Supplemental Specifications ` <br /> ' Contract Change Orders Appendix(s) <br /> Addenda dated: 7/1/2021 <br /> 1 <br /> 32 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.