My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Co., Inc. for the 2021 Storm Drainage Improvement Project City Project 2021-30
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Co., Inc. for the 2021 Storm Drainage Improvement Project City Project 2021-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 9:18:43 AM
Creation date
7/20/2021 5:25:45 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-128
Res Ord Title
R2021-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Entler Excavating Co., Inc. for the 2021 Storm Drainage Improvement Project City Project 2021-30
Department
Public Works
Approved Date
7/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY PROJECT 2021-30 <br /> GENERAL CONDITIONS <br /> INDEX <br /> Title Palze <br /> I <br /> Index .................................................................................... 36 <br /> GC-1 Certificate of Insurance.............................................. 37 to 38 <br /> GC-2 Clean Up ...................................... 39 <br /> .............................. <br /> GC-3 Construction Staking.................................................. 39 <br /> GC-4 Contract Warranty...................................................... 40 <br /> GC-5 Contractor Availability .............................................. 40 <br /> GC-6 Coordination............................................................... 40 <br /> GC-7 Dust Control............................................................... 40 <br /> GC-8 Estimated Quantities and Location Changes ............. 40 <br /> i GC-9 Fair Employment Practices........................................ 41 <br /> GC-10 Indemnification........................................................ 41 <br /> GC-11 Inspection................................................................. 41 <br /> GC-12 Lane Closure Permits............................................... 41 <br /> GC-13 Liquidated Damages ................................................ 41 to 42 <br /> GC-14 Location of Utilities................................................. 42 <br /> GC-15 Measurement and Payment...................................... 43 <br /> GC-16 Method of Payment.................................................. 43 <br /> GC-17 No Parking Signs ..................................................... 43 <br /> GC-18 Permits ..................................................... <br /> 43 <br /> GC-19 Documentation of Existing Conditions.................... 43 to 44 <br /> GC-20 Prevailing Wage Rates............................................. 44 <br /> GC-21 Project Maintenance................................................. 44 <br /> GC-22 Royalties, Patents and Copyrights ........................... 44 <br /> GC-23 Safety ....................................................................... 44 to 45 <br /> GC-24 Schedule Notification............................................... 45 <br /> GC-25 Taxes 45 <br /> GC-26 Trench and Excavation Safety ................................. 45 <br /> GC-27 Use of Fire Hydrants................................................ 45 <br /> GC-28 Termination for Public Convenience....................... 46 <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.