Laserfiche WebLink
Table 1 <br /> Brush College-Faries Parkway Grade Separation <br /> Project Estimate <br /> 7-1-2021 <br /> Total Estimated Proposed Illinois Jobs Proposed GCPF Proposed NS Proposed Proposed City <br /> Project Phase Transportation <br /> Cost Freight Funds Now!Funds Funds Contribution MFT Funds <br /> Earmark <br /> Right of Way <br /> Acquisition $5,800,000 $3,040,000 $2,000,000 $760,000 <br /> Engineering $3,925,745 $2,400,000 $1,525,745 <br /> Ameren Utility <br /> $4,150,000 $2,760,000 $1,390,000 <br /> Relocation <br /> Construction <br /> Engineering $4,541,821 $2,000,000 $1,500,000 $1,041,821 <br /> Construction $39,707,016 $23,800,000 $12,084,255 $1,000,000 $2,000,000 $822,761 <br /> NSRR $600,506 $600,506 <br /> CNRR $776,481 $776,481 <br /> AT&T <br /> Relocation $153,564 $153,564 <br /> Totals $59,655,133 $34,000,000 $3,500,000 $15,000,000 $1,000,000 $2,000,000 $4,155,133 <br /> Note: The Freight Funds require a 20%match which is generally being covered by the State Grade Crossing Protection Funds or Illinois <br /> Jobs Now!Funds. Other Local funds can also be used for the match. <br />