|
urr
<br /> Affidavit of Availability
<br /> • • For the Letting of 7/21/2021
<br /> rMupdrtalum (Letting date)
<br /> Bureau of Construction Instructions: Complete this form by either typing or using black ink.
<br /> 2300 South Dirksen Parkway/Room 322 "Authorization to Bid"will not be issued unless both sides of this form are
<br /> Springfield, Illinois 62764 completed in detail. Use additional forms as needed to list all work.
<br /> Part I. Work Under Contract
<br /> List below all work you have under contract as either a prime contractor or a subcontractor. It is required to include all pending low bids not yet awarded or
<br /> rejected. In a joint venture,list only that portion of the work which is the responsibility of your company. The uncompleted dollar value is to be based upon the most
<br /> recent engineer's or owners estimate,and must include work subcontracted to others. If no work is contracted,show NONE.
<br /> 1 2 3 4 Awards Pending
<br /> Contract Number MOT 74757 Local MFT 2021 Johns Hill Neighborhood IDOT 91603 IDOT 93770
<br /> Contract With UCM City of Decatur Romano Company UCM PH Broughton
<br /> Estimated Completion Date 12/22 12/21 10/21 10/21
<br /> Total Contract Price 183,351.00 1,120,512.69 1,387,922.75 268,740.00 452,777.00 Accumulated Totals
<br /> Uncompleted Dollar Value if Firm is the
<br /> Prime Contractor 392,179.44 1,744,196.44
<br /> Uncompleted Dollar Value if Firm is the
<br /> Subcontractor 183,351.00 962,485.61 268,740.00 452,777.00 4,219,950.71
<br /> Total Value of All Work 5,964,147.15
<br /> Part II. Awards Pending and Uncompleted Work to be done with your own forces.
<br /> List below the uncompleted dollar value of work for each contract and awards pending to be completed with your own forces. All work Accumulated
<br /> Subcontracted to others will be listed on the reverse of this form. In a joint venture,list only that portion of the work to be done by your
<br /> company. If no work is contracted,show NONE. Totals
<br /> Earthwork
<br /> 0.00
<br /> Portland Cement Concrete Paving 0.00
<br /> HMA Plant Mix 0.00
<br /> HMA Paving 260,788.53 719,607.48 3,174,684.85
<br /> Clean&Seal Cracks/Joints 0.00
<br /> Aggregate Bases&Surfaces 45,900.00 88,120.15
<br /> Highway,R.R.and Waterway Structures 0.00
<br /> Drainage 0.00
<br /> Electrical
<br /> 0.00
<br /> Cover and Seal Coats 106,248.00
<br /> Concrete Construction 30,000.00
<br /> Landscaping 0.00
<br /> Fencing 0.00
<br /> Guardrail 0.00
<br /> Painting 0.00
<br /> Underground Utilities 0.00
<br /> Cold Milling,Planning&Rotomilling 139,592.25 237,092.47
<br /> Demolition 0.00
<br /> Pavement Markings(Paint) 0.00
<br /> Other Construction(FDR) 0.00
<br /> Stabilization 183,351.00 57,385.88 240,736.88
<br /> CIR 268,740.00 452,777.00 1,163,513.00
<br /> Totals 183,351.00 260,788.53 962,485.61 268,740.00 452,777.00 5,040,395.35
<br /> Disclosure of this information is REQUIRED to accomplish the statutory purpose as outlined in the"Illinois Procurement Code". Failure to comply will
<br /> result in non-issuance of an"Authorization To Bid." This form has been approved by the State Forms Management Center.
<br /> i
<br /> Printed 7/20/2021 Page 3 of 14 BC 57(Rev.08/17/10
<br />
|