Laserfiche WebLink
ITEM F-Signal&Electrical Changes <br /> (see attached summary) <br /> Material: 0 <br /> Labor: 0 <br /> Purchase Services: 0 <br /> Other: 0 <br /> NET TOTAL-ITEM F $ <br /> ITEM G-Track Work <br /> Material: (see attached summary) 0 <br /> Labor: (see attached summary) 0 <br /> Additive: (see attached summary) 0 <br /> Purchase Services: (see attached summary) 0 <br /> D&C(Lump Sum): (see attached summary) 0 <br /> NET TOTAL-ITEM G $ - <br /> ITEM H-T-CUBED <br /> Lump Sum (see attached summary) <br /> NOTES <br /> 1.For all groups of CONTRACT employees,the composite labor <br /> surcharge rate used in this estimate(including insurance) <br /> is 185.81%. Self Insurance-Public Liability Property <br /> Damage is estimated at 16.00%. Work will be billed at <br /> actual current audited rate in effect at the time the <br /> services are performed. <br /> 2.For all groups of NON-CONTRACT employees,the composite <br /> labor surcharge rate used in this estimate(including <br /> insurance is 78.59%. Self Insurance-Public Liability <br /> Property Damage is estimated at 16.00% Work will be <br /> billed at actual current audited rate in effect at the <br /> time the services are performed. <br /> 3.,All applicable salvage items tems due the Deuartment will be <br /> made available to it at the iobsite fps its disposal. <br /> 4.The Force Account Estimate is valid for one(1)year <br /> alter the date of the estimate(07/14/2021). If the work is <br /> not performed within this time frame the Railway may <br /> revise the estimate to(1)include work not previously <br /> indicated as necessary and(2)reflect changes in cost <br /> to perform the force account work. <br /> Exhibit A <br />