My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-192 Resolution Authorizing Sponsored Research Agreement with the Board of Trustees of the University of Illinois for Hydrologic, Sediment and Nutrient Monitoring Upper Sangamon River Watershed
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-192 Resolution Authorizing Sponsored Research Agreement with the Board of Trustees of the University of Illinois for Hydrologic, Sediment and Nutrient Monitoring Upper Sangamon River Watershed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 10:29:25 AM
Creation date
10/21/2021 9:11:55 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-192
Res Ord Title
R2021-192 Resolution Authorizing Sponsored Research Agreement with the Board of Trustees of the University of Illinois for Hydrologic, Sediment and Nutrient Monitoring Upper Sangamon River Watershed
Department
Public Works
Approved Date
10/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Objectives <br /> The overall objective of this proposal is to provide hydrologic, suspended sediment, and nutrient <br /> monitoring at three sites in the Upper Sangamon River watershed. This monitoring data will provide data <br /> that will be used by the city of Decatur to develop a watershed management plan to protect the drinking <br /> water supply to the city and local communities and industry. <br /> Proiect Tasks <br /> To accomplish the project objectives,the following tasks will be undertaken. <br /> Task 1. Collect hydrologic, stage/discharge, data at monitoring stations. <br /> At all three stations,bi-weekly,a manual stage reading will be collected,as well as other site <br /> condition observations. Stream discharge rating curves that were developed by ISWS prior to 2008 for the <br /> Friends Creek bridge at Rt 48(ISWS#102) and Long Creek at Twin Bridge Rd. (ISWS#101)will be <br /> verified and updated with several manual discharge measurements made over a wide range of stages. <br /> Task 2. Collect suspended sediment and nutrient samples at monitoring stations. <br /> Bi-weekly suspended sediment,nitrate-N and total phosphorus samples will be collected by a <br /> field technician. Suspended sediment will be collected using a depth integrated method when conditions <br /> allow. Samples will be delivered and analyzed at the ISWS Public Service Laboratory in Champaign, <br /> Illinois. <br /> Task 3. Collect turbidity,pH, and temperature at monitoring stations. <br /> At all three stations, during each visit,in-situ turbidity,electrical conductivity and temperature <br /> data will be collected using equipment supplied by the City of Decatur. The City of Decatur will also <br /> supply all necessary calibration consumables. <br /> Deliverables <br /> The deliverables for this project are the data described in the above tasks. Hydrologic, suspended <br /> sediment,and nutrient data collected at each of the monitoring stations will be processed,computed,and <br /> compiled. Data will be maintained in a database at the ISWS and provided quarterly to the city of <br /> Decatur,IL and their designated consultant,Northwater Consulting. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.