Laserfiche WebLink
Lake Decatur Watershed Management Plan—Phase III Scope of Services&Budget <br /> Task 3.8: Lake Sedimentation and Bathymetry Program <br /> Considering the recent $92M investment in dredging, lake bathymetry and sediment accumulation monitoring is <br /> important to track the loss of lake storage capacity both spatially and temporally. It also serves as a means to estimate <br /> sediment yields and track progress towards reducing loading. It will also be a valuable resource for the City and <br /> community to have access to an updated and accurate map of the lake. <br /> The lake bathymetry and sediment accumulation monitoring strategy were developed during Phase II and the <br /> monitoring will commence in Phase III. The plan is to perform baseline lake-wide mapping in Phase III and establish <br /> between 6 and 11 formal cross-sections for monitoring every 2-3 years in subsequent phases. <br /> Lake-wide Bathymetric Baseline Mapping <br /> Northwater will perform the survey planning,execution,data post-processing,and production map(s)for internal and <br /> external use. It is estimated that the field survey will take between 5 and 8 weeks,depending on lake conditions. <br /> Survey will be performed using a motorized boat equipped with a XYLEM Sontek M9 Acoustic Doppler Profiler and GPS <br /> receiver. The M9 can profile bathymetry up to 40 m depth with 0.001 m depth resolution. HYPACK hydrological <br /> surveying software will be used to plan the survey to optimize results in key areas of interest and cross sections for <br /> follow-up monitoring. HYPACK will also be utilized to post-process the data and develop bathymetry profiles. When <br /> future monitoring is performed, the software can be utilized to calculate changes in lake storage (sediment <br /> accumulation). Lake level transducers will be installed during the entire duration of the survey to record accurate lake <br /> levels,this is important to properly correct the survey data for changing lake levels throughout the duration the survey <br /> period. High resolution and accurate surveying is necessary to monitor sediment accumulation. <br /> Upon completion of the survey and the data processing,Northwater will produce a professional lake bathymetry map, <br /> and establish the baseline conditions to enable efficient continued monitoring of lake bathymetry and sediment <br /> accumulation. <br /> Task 3.9: Policy& Ordinance Support <br /> Development, modifications and alterations along the shoreline of Lake Decatur and the contributing waterways <br /> impacts water quality, infrastructure, and the efficacy to cost-effectively manage and maintain the lake as a drinking <br /> water supply and recreational resource. This task continues from Phase II to support the City as needed related to <br /> policy and ordinance initiatives relevant to enhancing and protecting the lake and water resources. Specific tasks and <br /> activities are note defined but may include: <br /> • Policy and ordinance reviews. <br /> • Recommendations and proposed language for ordinances,policies etc. <br /> • Strategies and recommendations to integrate the Bluffs watershed plan into policies and ordinances. <br /> Task 3.10: General Consulting <br /> Due to the diverse range of tasks and activities in Phase III, a general consulting task is included to efficiently support <br /> the City as needed in case out of scope engineering or environmental consulting is requested. <br /> nor-filvvro'e'r <br />