Laserfiche WebLink
® Lake Decatur Watershed Management Plan—Phase III Scope of Services&Budget <br /> Task Summary Description <br /> practices on City-owned farmland,carbon and water <br /> quality trading pilot,and anchored,floating <br /> wetlands. <br /> • Survey,design and engineering of practices described <br /> in the 2020 Section 319 application—forested gully <br /> Task 3.6. BMP Engineering&Design stabilization and stair-step wetlands. <br /> • Other engineering services on an as-needed basis. <br /> • Continue coordination with the Illinois State Water <br /> Survey(ISWS)regarding monitoring at three stations <br /> (Sangamon at Cisco bridge, Long Creek, Friends <br /> Creek). <br /> • Commence automatic monitoring station at Cisco <br /> Bridge in partnership with NGRREC. Support NGRREC <br /> Task 3.7. Watershed Monitoring Program as needed. <br /> • Storm-event sampling at three stations and <br /> continued baseline monitoring of proposed BMP <br /> sites. <br /> • Design and implement a database system for <br /> monitoring datasets <br /> • Lake-wide bathymetric survey using acoustic Doppler <br /> technology. Serves as post-dredge baseline to <br /> Task 3.8.Lake Sedimentation&Bathymetry Program <br /> monitor sediment accumulation moving forward. <br /> • Produce Lake Decatur bathymetry map for City and <br /> public use. <br /> • Continued support in assessment, planning and <br /> management of the dewatering basin. <br /> • Assessment of city-controlled properties and <br /> Task 3.9. Policy Ordinance Planning&Support development of a plan to capitalize on opportunities <br /> to improve water quality. <br /> • Support the City in developing guidelines and by-laws <br /> for lakeshore property transactions. <br /> Task 3.10. General Consulting • Budget for general consulting for out of scope <br /> services or support that may be requested. <br /> a <br />