My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-200 Resolution Authorizing Amendment No. 2 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-200 Resolution Authorizing Amendment No. 2 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 11:22:28 AM
Creation date
11/3/2021 11:30:50 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-200
Res Ord Title
R2021-200 Resolution Authorizing Amendment No. 2 for Professional Engineering Services Agreement with Northwater Consulting for Lake Decatur Watershed Management Plan City Project 2019-38
Department
Public Works
Approved Date
11/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lake Decatur Watershed Management Plan—Phase III Scope of Services&Budget <br /> c. Marketing and outreach initiatives(i.e. locally sourced products). <br /> This task includes further advancement of these project opportunities through coordinating with the City,stakeholders, <br /> landowners, regulators, and the private sector. Northwater will advance feasibility analyses, develop final costs and <br /> initiate the necessary funding proposal(s)for the floating wetlands. <br /> Northwater will continue to work with partners to establish the carbon and water quality trading pilot, complete one <br /> year of field trials and monitoring at the well field site, work with the City and farmland manager to incorporate <br /> conservation practices into future lease agreements on City-owned property, and forward drainage, multi-use and <br /> organic farming projects at the Oakley Sediment Basin. <br /> Task 3.6: BMP Engineering& Design <br /> Engineering and design is required under Phase 111 to support project implementation under the 2020 Section 319 <br /> grant,for special projects described in Task 3.5,and to support any needs that may arise from work performed under <br /> Task 3.4. Northwater will complete or sub-contract the necessary surrey and design for the following: <br /> 1. Forested gully stabilization—2020 Section 319 grant. <br /> 2. Stair-step wetlands on Macon County Conservation District properties—2020 Section 319 grant. <br /> Additional engineering support is included on an as needed basis and may include: <br /> 1. Floating treatment wetlands. <br /> Task 3.7: Watershed Monitoring Program <br /> The monitoring program includes: <br /> 1. Database <br /> o A relational database system will be designed setup to store and manage all monitoring data. Data <br /> will be maintained in a relational MS Access database using the SiteFX data model developed by <br /> EarthFX Inc. The system has quality assurance / quality control integration and streamlines data <br /> organization, documentation, and validation. A disciplined management procedure will make it cost <br /> and time efficient to utilize data for analysis,decision-making,management,and reporting. <br /> o Managing and maintaining the database will be an on-going and important part of the monitoring <br /> program. <br /> I <br /> "w tor'hwater <br />
The URL can be used to link to this page
Your browser does not support the video tag.