My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-218 Resolution Approving a Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc., for the Brush College/Faries Parkway Grade Separation Project City Project 2009-33 Section 09-00933-01-BR
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-218 Resolution Approving a Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc., for the Brush College/Faries Parkway Grade Separation Project City Project 2009-33 Section 09-00933-01-BR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 1:17:53 PM
Creation date
12/8/2021 1:17:48 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-218
Res Ord Title
R2021-218 Resolution Approving a Local Public Agency Engineering Services Agreement with AECOM Technical Services, Inc., for the Brush College/Faries Parkway Grade Separation Project City Project 2009-33 Section 09-00933-01-BR
Department
Public Works
Approved Date
12/6/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UCat'o�s Department Direct Costs Check Sheet <br /> of Tn� <br /> COMPANY NAME:AECOM Technical Services,Inc. <br /> PTB NUMBER <br /> TODAYSDATE 2021-11.03 <br /> Per Diem(per GOVERNOR'S TRAVEL CONTROL ^Up to slate rate maximum(Use 7 00 per quarter day=29 OD per: X 1,043 $2800. $29,204.00 <br /> BOARD) day) <br /> Lodging <br /> (per GOVERNORS CONTROL BOARD) Actual cost(Up to state rate maximum) X 1,043 S11000. S114.73000 <br /> 'S <br /> Lodging Taxes and Fees Actual cost $O W SO 00 <br /> (per GOVERNOR'S TRAVEL CONTROL BOARD) <br /> Air Faro Coach rate,actual cost,requires minimum two timer'notice, so W, $000 <br /> with prior[DOT approval <br /> Vehicle Mileage(per GOVERNOR'S TRAVEL Up to slate rata maximum X 2,600 50.560 51,456 W <br /> CONTROL BOARD) - <br /> Vehicle Owned or Leased $32 Wolf day(4 tours or less)or S65U day X 259 $6500. 516,83500 <br /> Vehicle Rental Actual cost(Up to$65tday) X 600 $6500. 339,000 00 <br /> Talks Actual cost $000 $000 <br /> Packing Actual cost SO OO. 5000 <br /> Over" Premium portion(Submit supporting documentation) $000, $000 <br /> Shift Differential Actual cost(Based on firm's poky) $0 00 $000 <br /> Overnight Oeivery/PostagalCourier Service Actual cast(Submit supporting docornentatien) X oro S30 GO 590000 <br /> Copies of DellverableWyfars(In-house) Actual cost(Submit supporting documentation) 50.50 $000 <br /> Copies of Detkvembiea/Myirs(Outside) Actual cost(Submit supporting doarrnentatlon) $050 $000 <br /> Pro)ecl Specific Insurance(Railroad) Actual cost 510,000.00 S000 <br /> Monuments(Permanent) Actual cost S11500 5000 <br /> Photo Processing Actual cost $0 00 50 DO <br /> 2-Way Radio(Survey at Phage of aiy) Attu if cost 5000 $000 <br /> Telephone Usage(Traffic System Monitoring Only) Actual cost $0 00 $000 <br /> CARD Actual cost(Max S15t our) $0 00 $000 <br /> Web Site Actual cost(Submil supporting documentation) 5000 5000 <br /> Advertisements Actual cost(Subrrklt supporting documentation) S000 $O OD <br /> Public Meeting Facility Rental Actual cost(Submit supporting documentation) 5000 S000 <br /> Public Meeting ExhibitsfRendecngs a F-0kdpmem Aminal cost(Submit supporting documentation) .$000 $0 00 <br /> Recording Fees Actual cost $0.00 5000 <br /> Transedplions(specific to pro(ed) Actual cost SO OO 1110 00 <br /> Courthouse Fees Actual cost $1500 S000 <br /> Storm Sewer Cleaning and Televising Actual cost(Requires 2-3 quotes with IDOT approval) 5000 S000 <br /> Traffic Control and Protection Actual cost(Requires 2-3 quotes with IDOT approval) $000 $000 <br /> Aerial Photography and Mapping Actual cost(Reghires2-3 quotes with IDOT approval) $0,00 $000 <br /> Utility Exploratory Trenching Actual cost(Requires 2-3 quotes with IDOT approval) $0.00 $000 <br /> Testing of Sell Samples' Actual cost S0010 $0 00 <br /> Lab Services* Actual cost(Provide breakdown of each cost) S0.00 $0 00 <br /> Equipment andlor Specialized Equipment Rental' Actual cost(Requires 2.3 quotes with IDOT approval) S000 50 GG <br /> Railroad Flagging Services Actual cast $1,30000 50 00 <br /> Railroad Right of Entry Few Actual cast � - 52,250 00 $000 <br /> Railroad Cable Locate Fee *Actual cost $350 OD S000 <br /> Mise Envirormlental field supplies Actual cost $10.00 $0 00 <br /> SUS 0.115r.9 quote Actual cost So.00 S000 <br /> IEPA Permits - Actual cost - 510000 $000 <br /> RR wire and Pipe permit application Fee(avg) Actual cost - $1,95000. $000 <br /> Environmental Database Report Actual cast $0,00 $000 <br /> Environmental EgtA muent-PholoWniza0on Detector Actual cost S000 S000 <br /> Roberts Environmental Drilhg 0-sole(add RR urs) Actual cost $000 $000 <br /> Environmmlal Equipment-Water Level Indicator Actual cost $5000 110 00 <br /> Test America Quote .Actual cost S000 $000 <br /> ACM LCP Laboratory Analysis Actual cost S000 SO.00 <br /> Wheatland Tito Commitments Quote Actual cost woo S000 <br /> AMTRAK Actual cost S10000 SO OD <br /> 50,00, 50.00 <br /> 'Il odw aaowable costs we needed and rot fisted.please add it ft above spaces provided <br /> LEGEND <br /> W 0=Work Order <br /> J S=Job Specific <br /> Pa-NTED 2021.11-03 A45 sot 436111".02102/17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.