My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-236 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Plocher Construction Inc. for Clarifier Conversion Project City Project 2016-03
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-236 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Plocher Construction Inc. for Clarifier Conversion Project City Project 2016-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 4:24:42 PM
Creation date
12/21/2021 4:39:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-236
Res Ord Title
R2021-236 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Plocher Construction Inc. for Clarifier Conversion Project City Project 2016-03
Department
Public Works
Approved Date
12/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM SPEC. SECTION , <br /> and/or PLAN SHEET(S) DESCRIPTION <br /> Drawing S-104 —SOUTH SCC REPLACE reference to S-301 with S-303 on <br /> 9 —CONNECTOR CHANNELS section cut indicating Detail Al located where the <br /> channel turns west at the top of the drawing. <br /> Drawings S-110 SCC — Drawing S-110 rebar is for the buttress slab while <br /> BUTRESS SLAB PLAN and the sloped wall rebar shown on Drawing S-302 will <br /> S-302 SCC —SECTIONS AND need to be quantified using structure geometry. <br /> 10 DETAILS I The spacing needs to be at 6-inches at the top of <br /> Clarification the sloped section. The bars will be closer together <br /> at the bottom of the sloped wall. <br /> Drawing S-303 —SOLIDS The new connector channel walls through an <br /> CONTACT CLARIFIER— existing channel are full height from existing <br /> SECTIONS AND DETAILS II channel (EL 637.75) to bottom of Existing Slab (EL <br /> Detail Al 643.83). It is acceptable to core drill several holes ' <br /> 11 Clarifications in the top slab to get access to pouring the wall <br /> forms from above the channel or outside. Space <br /> between the new channel walls and the existing <br /> channel walls does not need to be backfilled. <br /> Drawing S-304 - SOLIDS INSERT revision 1 of this drawing dated <br /> 12 CONTACT CLARIFIER— 11/22/2021 into the drawing set. <br /> SECTIONS AND DETAILS III <br /> Drawing S-305 — MISC. INSERT revision 0 of this drawing dated <br /> 13 STRUCTURAL SECTIONS 11/22/2021 into the drawing set. <br /> Drawing D-101 — PROCESS INSERT revision 1 of this drawing dated <br /> 14 MECHANICAL SITE PLAN 11/22/2021 into the drawing set, added two <br /> references to items detailed on new Sheet D-506. <br /> Drawing D-110 —ALUM INSERT note "FIT-501" and leader into Detail Al, <br /> 15 CHEMICAL STORAGE & ALUM CHEMICAL STORAGE PLAN in Quadrant <br /> FEED SYSTEM MODS I B1 to proposed line without a label. <br /> Drawing D-506— FILTER INSERT revision 0 of this drawing dated <br /> 16 INFLUENT FLUME PLANS 11/22/2021 into the drawing set. , <br /> AND DETAILS <br /> END OF ADDENDUM NUMBER 02 ' <br /> Decatur WTF/16011-01 3 of 3 Addendum No. 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.