My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-10 Resolution Authorizing Local Public Agency Agreement for Federal Participation with the State of Illinois for the Brush College/Faries Parkway Grade Separation City Project 2009-33 Section 09-00933-01-BR
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-10 Resolution Authorizing Local Public Agency Agreement for Federal Participation with the State of Illinois for the Brush College/Faries Parkway Grade Separation City Project 2009-33 Section 09-00933-01-BR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:31:33 PM
Creation date
1/20/2022 2:31:30 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-10
Res Ord Title
R2022-10 Resolution Authorizing Local Public Agency Agreement for Federal Participation with the State of Illinois for the Brush College/Faries Parkway Grade Separation City Project 2009-33 Section 09-00933-01-BR
Department
Public Works
Approved Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Public Agency Agreement o 0 <br /> Of Transp0l"tOfl for Federal Participation <br /> LOCAL PUBLIC AGENCY <br /> Local Public Agency Countv Section Number <br /> City of Decatur on 09-00933-01-BR <br /> Fund ly2e ITEP SRTS HSIP Number(s) h MPO Name MPO TIP Number <br /> NHFP/GCPF/STATE N/A DUATS DEC 19-09 <br /> N Construction on State Letting ❑ Construction Local Letting ❑ Day Labor, ❑ Local Administered Engineering ❑ Right-of-Way <br /> Construction Engineering Right of Way <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-106-21 3 E LT(222) 11 IL IL 77-1 <br /> This Agreement is made and entered into between the above local public agency,hereinafter referred to as the"LPA"and the State of <br /> Illinois,acting by and through its Department of Transportation,hereinafter referred to as"STATE".The STATE and LPA jointly propose to <br /> improve the designated location as described below.The improvement shall be consulted in accordance with plans prepared by,or on <br /> behalf of the LPA and approved by the STATE using the STATE's policies and procedures approved and/or required by the Federal <br /> Highway Administration, hereinafter referred to as"FHWA". <br /> LOCATION <br /> Stationing <br /> Local Street/Road Name Ke Route Len th From To <br /> Brush College Road —� FAU 7448 0.01 2.72 2.73 <br /> Location Termini <br /> [ver Faries Parkway and Norfolk Southern Railroad <br /> Current Jurisdiction Existing Structure Number(s) Add Location <br /> City of Decatur /A Remove <br /> PROJECT DESCRIPTION <br /> Construction of a grade crossing separation of Brush College Road over Faries Parkway and the Norfolk <br /> Southern Railroad. <br /> LOCAL PUBLIC AGENCY APPROPRIATION-REQUIRED FOR STATE LET CONTRACTS <br /> By execution of this Agreement the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance to <br /> fund the LPA share of project costs.A copy of the authorizing resolution or ordinance is attached as an addendum. <br /> Check One MF-TNQQ OF FINANQINQ-, tata-Let Contract Work Oln[y) <br /> 0 METHOD A-Lump Sum(60%of LPA Obligation ) <br /> Lump Sum Payment-Upon award of the contract for this Improvement,the LPA will pay the.STATE within thirty(30)calendar days of <br /> billing, in lump slum,an mount equal to W16 of the LPA%estimated obligation incurred under this agreement.The LPA will pay to the <br /> STATE the remainder of the LPWs obligation(Including any nonparticipating costs)in a lump sum within thirty(30)calendar days of bulling <br /> in a lump sum,upon completion of the project based on final casts, <br /> Q METHOD B- Monthly Payments of due by the of each successive month. <br /> Monthly Payments-Upon award of the contract for this Improvement,the LPA will pay to the STATE a specified amount each month for <br /> an estimated period of months,or until 80%of the LPA's estimated obligation under the provisions of the agreement has been paid.The <br /> LPA will pay to the STATE the remainder of the LPA's obligation(including any noriparti6pabrig costs)in a lump sum,upon completion of <br /> the project based upon final costs, <br /> N METHOD C-LIPA's Share BALANCE divided by estimated total cost multiplied by actual progress payment. <br /> Progress Payments-Upon receipt of the contractor's first and subsequent progressive bills for this improvement,the LPA will pay to the <br /> STATE within thirty(30)calendar days of receipt,an amount equal to the LPA's share of the construction cost divided by the estimated <br /> total cost multiplied by the actual payment(appropriately adjust for nonparticipating costs)made to the contractor until the entire obligation <br /> incurred under this agreement has been paid. <br /> Printed 01/12/22 Page 1 of 6 BLR 05.310(Rev.02/03121) <br /> Page 37 of 163 <br /> Exhibit A <br />
The URL can be used to link to this page
Your browser does not support the video tag.