Laserfiche WebLink
Public Works <br /> DATE: 1/5/2022 <br /> MEMO: 2022-3 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Scot Wrighton,City Manager <br /> Matthew C.Newell, P.E., Public Works Director <br /> SUBJECT: <br /> Resolution to Approve a Preliminary Engineering Services Agreement with WHKS and Co. and Appropriate Motor <br /> Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street <br /> SN 058-6001 <br /> City Project 2020-22 <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached Resolution authorizing the Mayor to sign and the City Clerk to <br /> attest a Resolution approving a preliminary engineering services agreement with WHKS and appropriating$19,784.50 in State <br /> Motor Fuel Tax(MFT)funds to perform preliminary engineering services for the Garfield Avenue Bridge over 22nd Street. <br /> BACKGROUND: <br /> City staff conducts routine bridge inspections of 28 bridges throughout the City. Bridge inspections are completed within <br /> guidelines set by the Illinois Department of Transportation(IDOT)and the Federal Highway Administration(FHWA). The <br /> routine inspections by the City can lead to findings that require a more detailed review,structural analysis,and/or repair. The <br /> Garfield Bridge over 22nd Street is a pin and hanger bridge which requires an ultra-sonic inspection of the pins every 4 years <br /> since they cannot be visually seen. In 2020,AECOM completed the ultra-sonic inspection,the regular inspection and prepared <br /> an updated design report that was submitted to the Illinois Department of Transportation. <br /> Request for Proposals <br /> On May 19,2021,the City issued a request for proposals and qualifications to provide design services to rehabilitate the <br /> Garfield Avenue Bridge over 22nd St. Proposals were received on June 16,2021. Six firms submitted formal statements of <br /> qualifications. Public Works Department staff reviewed the proposals and recommended WHKS &Co.,of Springfield,IL,as <br /> the firm best able to serve the City in performing the requested design services. <br /> Engineering Services Agreement <br /> The City started scope negotiations with WHKS in mid-2021 and determined that additional analysis of the structure is <br /> necessary to determine the bridge repair options and accurately scope the final design services. The proposed professional <br /> service agreement will review the existing bridge condition report,update cost options for rehabilitation or replacement,and <br /> preform a preliminary substructure adequacy calculation. <br /> The proposed total fee is $19,784.50,which will be paid with State Motor Fuel Tax funds. <br /> PRIOR COUNCIL ACTION: <br /> June 20,2016—The City Council was given a memorandum detailing the condition and status of the City's bridges that fall <br /> within the jurisdiction of the National Bridge Inspection Standards (NBIS). This memorandum identified bridges that were <br /> knnum to('itv staff ac having ctrnnfiiral ennrarnc ThP fnllnwino hrir�aPc wPrP i�antifiPrl <br />