My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-12 Resolution to Approve a Preliminary Engineering Services Agreement with WHKS and Co. and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street, SN 058-6001, City Project 2020-22
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-12 Resolution to Approve a Preliminary Engineering Services Agreement with WHKS and Co. and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street, SN 058-6001, City Project 2020-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:43:39 PM
Creation date
1/20/2022 2:43:37 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-12
Res Ord Title
R2022-12 Resolution to Approve a Preliminary Engineering Services Agreement with WHKS and Co. and Appropriate Motor Fuel Tax Funds for the Garfield Avenue Bridge over 22nd Street, SN 058-6001, City Project 2020-22
Department
Public Works
Approved Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2)The grantee's or contractor's policy to maintain a drug free workplace; <br /> (3)Any available drug counseling,rehabilitation and employee assistance program;and <br /> (4)The penalties that may be imposed upon an employee for drug violations. <br /> (c)Providing a copy of the statement required by subparagraph(a)to each employee engaged in the performance of the <br /> contract or grant and to post the statement in a prominent place in the workplace. <br /> (d)Notifying the contracting,or granting agency within ten(10)days after receiving notice under part(b)of paragraph <br /> (3)of subsection(a)above from an employee or otherwise,receiving actual notice of such conviction. <br /> (e)Imposing a sanction on,or requiring the satisfactory participation in a drug abuse assistance or rehabilitation <br /> program. <br /> (f)Assisting employees in selecting a course of action in the event drug counseling,treatment and rehabilitation is <br /> required and indicating that a trained referral team is in place. <br /> Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act, <br /> the ENGINEER,LPA and the Department agree to meet the PROJECT SCHEDULE outlined in EXHIBIT B.Time is of the <br /> essence on this project and the ENGINEER's ability to meet the PROJECT SCHEDULE will be a factor in the LPA selecting the <br /> ENGINEER for future projects.The ENGINEER will submit progress reports with each invoice showing work that was completed <br /> during the last reporting period and work they expect to accomplish during the following period. <br /> 10. Due to the physical location of the project,certain work classifications may be subject to the Prevailing Wage Act(820 ILCS <br /> 130/0.01 et seq.). <br /> 11. For Preliminary Engineering Contracts: <br /> (a)That tracing,plans,specifications,estimates,maps and other documents prepared by the ENGINEER in accordance <br /> with this AGREEMENT shall be delivered to and become the property of the LPA and that basic survey notes, <br /> sketches, charts,CADD files,related electronic files,and other data prepared or obtained in accordance with this <br /> AGREEMENT shall be made available,upon request to the LPA or to the DEPARTMENT,without restriction or <br /> limitation as to their use.Any re-use of these documents without the ENGINEER involvement shall be at the LPA's <br /> sole risk and will not impose liability upon the ENGINEER. <br /> (b)That all reports,plans,estimates and special provisions furnished by the ENGINEER shall conform to the current <br /> Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Manual or any other <br /> applicable requirements of the DEPARTMENT,it being understood that all such furnished documents shall be <br /> approved by the LPA and the DEPARTMENT before final acceptance.During the performance of the engineering <br /> services herein provided for,the ENGINEER shall be responsible for any loss or damage to the documents herein <br /> enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the <br /> ENGINEER's expense. <br /> AGREEMENT SUMMARY <br /> Prime Consultant TIN/FEIN/SS Number Agreement Amount <br /> WHKS&Co 42-0943938 $19,784.50 <br /> Subconsultants TIN/FEIN/SS Number Agreement Amount <br /> Subconsultant Total <br /> Prime Consultant Total $19,784.50 <br /> Total for all worki $19,784.50 <br /> add;§ubcxinsultant" <br /> AGREEMENT SIGNATURES <br /> Executed by the LPA: <br /> Local Public Agency Type Name of Local Public Agency <br /> Attest: The City of Decatur <br /> B Si nature&Date B Si nature&Date <br /> IAV <br /> Name of Local Public Agency <br /> Local P c Agency Type M Title <br /> l._ ,, <br /> Decatur City clerk W <br /> (SEAL) <br /> Completed0l/11/22 Page 5 of 10 BLR 05530(Rev.08/05/21) <br />
The URL can be used to link to this page
Your browser does not support the video tag.