My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-30 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Construction Services for the Ellen and Division Inflow and Infiltration Reduction Program, City Project 2018-01
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-30 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Construction Services for the Ellen and Division Inflow and Infiltration Reduction Program, City Project 2018-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 1:59:27 PM
Creation date
2/24/2022 1:59:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-30
Res Ord Title
R2022-30 Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services, Inc. to Provide Construction Services for the Ellen and Division Inflow and Infiltration Reduction Program, City Project 2018-01
Department
Public Works
Approved Date
2/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
time of inspection. Documentation shall be available for review by the City's Representative at <br /> all times. Specifically,the Consulting Engineer shall, in addition the above, <br /> a. Prepare Inspector's Daily Reports and Quantity Book as required in the Manual. <br /> b. Maintain, at the job site,orderly files for correspondence,reports of job conferences, Shop <br /> Drawings and samples,reproductions of original Contract Documents, including all <br /> Addenda, Change Orders,Field Orders,additional Drawings issued subsequent to the <br /> execution of the Contract,the Consulting Engineer's clarifications and interpretations of the <br /> Contract Documents,progress reports, and other Project-related documents. <br /> C. Keep a diary or log book,recording the Contractor's hours on the job site,weather conditions, <br /> data relative to questions of Change Orders, or changed conditions,list of job site visitors, <br /> daily activities, decisions,observations in general, and specific observations in more detail,as <br /> in the case of observing test procedures and send copies to the City's Representative. <br /> d. Take multiple photographs of the Work and keep a log and file of the photos.The <br /> photographs shall be provided to the City's Representative upon demand and at project <br /> closeout. <br /> e. Record names,addresses and telephone numbers of all the Contractors, Subcontractors, and <br /> major suppliers of materials and equipment. <br /> 7. Reports. The Consulting Engineer shall, <br /> a. Furnish the City's Representative periodic reports, as required,on progress of the Work and <br /> of the Contractor's compliance with the progress schedule and schedule of Shop Drawings <br /> and sample submittals. <br /> b. Consult with the City's Representative,in advance of scheduled major tests, inspections,or <br /> start of important phases of the Work. <br /> C. Draft proposed Change Orders and obtaining back-up material from the Contractor,and make <br /> recommendations to the City's Representative regarding Change Orders and Field Orders. <br /> d. Report immediately to the City's Representative upon the occurrence of any accident. <br /> 8. Contract Interpretation;Review of Quality of Work. The Consulting Engineer shall: <br /> a. Issue all instructions of the City's Representative to the Contractor(s). <br /> b. Issue necessary interpretations and clarifications of the Contract Documents and in <br /> connection therewith prepare change orders as required, subject to the City's Representative's <br /> approval. <br /> C. Have authority,as a representative of the City,to require special inspection or testing of the <br /> work. <br /> d. Act as initial interpreter of the requirements of the Contract Documents and judge of the <br /> acceptability of the work there under and make decisions on all claims of the Coutractor(s) <br /> relating to the acceptability of the work or the interpretation of the requirements of the <br /> Contract Documents pertaining to the execution and progress of the work. <br /> 9. Prepare Engineer's Pay Estimate.The Consulting Engineer shall,based on the Consulting <br /> Engineer's on-site observations as an experienced and qualified design professional and on review <br /> of the Inspectors Daily Reports and Quantity Book, determine the amounts owing to the <br /> 3 <br /> Last Revised:2/03/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.