Laserfiche WebLink
Automotive Equipment Sales -& Service, <br /> 161 U.S.Highway 51 <br /> PAHA, IL 62557 <br /> Ph. 877-,5624940 Fax 217-552-7084 <br /> CITY OF DECATUR <br /> ATTN:ACCOUNTING DIVISION Estimate <br /> #1 GARY K ANDERSON PLAZA <br /> DECATUR,IL 62623-1196 <br /> 19330 <br /> DATE P.O.NO. TERMS DUE DATE REP FOB PROJECT <br /> 2/912022 DUE ON RECEIPT 1/15/2029 BJH <br /> ITEM DESCRIPTION*; QTY TOTAL <br /> PREVAILING WAGE <br /> inground-AVBE REMOVAL OF EXISTING CYLINDERS AND FRAME AND 1 13,929.75 <br /> INSTALLATION OF NEW UNIT <br /> (WILL USE THE EXISTING HEAD) <br /> In Ground Lit installation. <br /> Does not include any air or electrical connections. <br /> Does not Include group 24 batteries for Shockwave lifts. <br /> Any unseen underground conditions,i.e.high water table, <br /> underground utilities,underground foundations,atm.will be invoiced <br /> as an extra at our usual time and material'Wes.We will notify the <br /> owner immediately upon encountering any of these conditions. <br /> Inground lift install includes 5 ton fill gravel and finish concrete. <br /> Customer provides roll-off for debris&19 quarts of Dexron III ATF <br /> fluid. <br /> Standard lift color is Rotary blue unless otherwise specified. <br /> CON PURCHASE OF CONCRETE AND ROCK-T(1 BE DETERMINED 1 O.00T <br /> AT TIME OF ORDER <br /> ROT JK1413 ENVIROGUARD 10 X 70 DUAL JACK ASSEMBLY 1 27,760.00T <br /> ROT FA2105BK STRUT FRONT&REAR 2 2,770.007 <br /> ROT FD8493BK REAR JACK FRAME(HOUSING) 1 2,922.WT <br /> ROT FA2396 DUAL LATCH KIT 1 2,286.00T <br /> ROT FD5268 BOLT BAG 1 54.00? <br /> ROT SS Rotary Steel Surcharge 1 3,393.08T <br /> FRT SHIPPING CHARGES-TO BE DETERMINED AT TIME OF ORDER 1 0.00 <br /> Forklift BOBCAT,EXCAVATOR AND BREAKER-2 DAYS 1 480.00 <br /> Estimate Disclaimer Estimate does not include any additional labor or parts that is found 0.00 <br /> needed while conducting the estimated repalrs. <br /> WWW AUTOMOTIVE-EQUIPN ENT-SA.LES.COM TOTAL <br /> A.E.S.S.does accept credit card payments.However,the vendor changes us a 4%processing fee on au payments.We will add a 49'0 convenience <br /> The to all invoice amoauts exceeding 51000.00. <br /> Page 1 <br /> Exhibit A <br />