Laserfiche WebLink
Agreement No 21-203195 <br /> EXHIBIT A <br /> PROJECT DESCRIPTION <br /> Grantee must complete the Award Activities described on this Exhibit A,the Deliverables and Milestones listed on <br /> Exhibit B and the Performance Measures listed on Exhibit E within the term of this Agreement,as provided in <br /> paragraph 1.4,herein. <br /> AUTHORITY: The Grantor is authorized to make this Award pursuant to 20 ILCS 605/605-55 and/or 20 ILCS <br /> 605/605-30. <br /> The purpose of this authority is as follows: <br /> To make and enter into contracts,including grants,as authorized pursuant to appropriations by <br /> the General Assembly. and/or to use the State and federal programs,grants,and subsidies that <br /> are available to assist in the discharge of the provisions of the Civil Administrative Code of <br /> Illinois. <br /> PROJECT DESCRIPTION: <br /> The Grantee is a governmental entity providing essential public services to residents of the City of Decatur, IL. <br /> Grant funds will be utilized for a portion of the prior incurred costs associated with the design and implementation <br /> of HVAC and temperature control improvements to the Grantee-owned Public Library located at 130 N. Franklin <br /> Street in Decatur,IL. The facility was designed and constructed in 1967 and is currently running the same air <br /> handling system installed at that time.The system is old and certain system elements having deteriorated from <br /> efficient and cost-effective operations,resulting in inefficient operation and cost to operate.In addition,the <br /> system has deteriorated to such a level that presents concern of risk to effective air handling operations in the <br /> facility.Grant funds will be used for costs associated with as-built closeout documents and the replacement of <br /> components to the air handling system.These upgrades will provide energy cost savings in the operation of the <br /> facility. <br /> Specifically,Grant funds will be used for a portion of the prior incurred costs associated with the project as follows: <br /> • Design/Engineering—to include costs associated with as-built documents. <br /> • Mechanical Systems—to include costs associated with the purchase,installation,and replacement of VAV <br /> boxes,controls,water and air balance systems,and all related appurtenances. <br /> The completion of this renovation will benefit the public by improving energy efficiency and cost savings in the <br /> Grantee owned Public Library. <br /> State of Illinois <br /> INTER-GOVERNMENTAL GRANT AGREEMENT FISCAL YEAR 2022/3 4 21 <br /> Page 26 of 47 <br />