Laserfiche WebLink
be .,t least 21 ..eats of ago 1. Provide proof of one of the following: <br /> -a. Professionally Licensed Electrical EngineerM+al" <br /> b.ho pieeff- Not less than four years practical experience in the field <br /> of electrical construction for power, light, and heat undef the difeetion ^f <br /> heensed eleet iiia , or related work, which can be verified,under the direction <br /> of a licensed electrician or licensed electrical contractor. <br /> seheel. Stieh eetifse shall be a minimtffn of�� (4) years. Either-or-both "alifiefffiefis s <br /> be verified by the heensed eentmeter-of seheel dir-eedy to the Eleetr-ieal Commission at <br /> two (2)weeks prior-to the examinatiow. <br /> 6EXAAUNATION Onee appfeval is granted by the Eleetfieai <br /> Commission the YY 1 + shall make ., nDo ents on his own to t„ke2. Provide <br /> proof of a passing score of the International Code Council"C _Master <br /> ElectricianL'exam. as pr-epafed and administered by the intemational Code Couneil <br /> National GepAr-aeter- Trades Examination -Program. Proof of a passing seer-e will <br /> then be_s4mit4ed t the Building T Y tions Division; order-to obtain a heefise <br /> (B) The Supervising Electrician shall be employed with the electrical contractor, and <br /> should be available if necessary for any and all inspections if requested by the Building <br /> Inspections Division <br /> (C) In the event of any change or termination of the Supervising Electrician the licensed <br /> electrical contractor must have another named Supervising Electrician who meets the <br /> qualifications of Subsection 5 of this Chapter apply within 10 days for review and re-license. <br />