My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-73 Resolution Authorizing a Professional Engineering Services Agreement with INTERA Inc. for Vulcan Pit, Rhodes Landfill and Source Water Protection Plan, City Project 2022-22
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-73 Resolution Authorizing a Professional Engineering Services Agreement with INTERA Inc. for Vulcan Pit, Rhodes Landfill and Source Water Protection Plan, City Project 2022-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 4:49:38 PM
Creation date
5/4/2022 4:49:34 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-73
Res Ord Title
R2022-73 Resolution Authorizing a Professional Engineering Services Agreement with INTERA Inc. for Vulcan Pit, Rhodes Landfill and Source Water Protection Plan, City Project 2022-22
Department
Public Works
Approved Date
5/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consulting Engineer expressly acknowledges,recognizes and agrees that the only authority to <br /> approve Amendments to this Agreement or the Scope or Services or the cost(s)therein is with the <br /> City Council of the City. <br /> SECTION II. BASIC SERVICES <br /> A. STUDY AND REPORT PHASE. <br /> The Consulting Engineer shall: <br /> 1. City's Requirements.Review available data and consult with the City's Representative to clarify <br /> and define the City's requirements for the Project. <br /> 2. Advise Regarding Additional Data. Advise the City's Representative as to the necessity of the <br /> City's providing or obtaining from others data or services of the types described in Section V(C) <br /> in order to evaluate or complete the Project,and act as the City's representative in connection <br /> with any such services. <br /> 3. _Technical Analysis. Provide analysis of the City's needs,planning surveys,site evaluations,and <br /> comparative studies of prospective sites and solutions. <br /> 4. Economic Analysis. Provide a general economic analysis of the City's requirements applicable to <br /> various alternatives in accordance with economic parameters and assumptions provided by the <br /> City's Representative. <br /> 5. Report Preparation. Prepare a report("Study Report")containing schematic layouts,sketches and <br /> conceptual design criteria with appropriate exhibits to indicate clearly the considerations involved <br /> and the alternative solutions available to the City of Decatur. The Study Report shall also set <br /> forth the Consulting Engineer's findings and recommendations with opinions of probable costs <br /> for the Project,including construction cost,contingencies,allowances for charges of all <br /> professionals and consultants,allowances for the cost of land and rights-of-way,allowances for <br /> the relocation of utility facilities and equipment if necessary,and compensation for or damages to <br /> properties and interest and financing charges(all of which are hereinafter called"Project Costs"). <br /> Specific requirements for the Study Report are included in Exhibit A,Scope of Services. <br /> 6. Report Presentation. Furnish paper copies and digital copies of the Study Report in the number <br /> and format specified in Exhibit A,Scope of Work,and present and review the Study Report in <br /> person with the City as the City's Representative shall direct. The cost of reproduction of the <br /> Study Report shall be considered a reimbursable expense and paid in accordance with Section <br /> V(C)of this Agreement. <br /> 7. Completion Time. The Study Report shall be completed,submitted and accepted by the City's <br /> Representative within the time period set forth in Exhibit C,Project Timeline. <br /> B. PRELIMINARY DESIGN PHASE. <br /> The Consulting Engineer shall,after written authorization to proceed with the Preliminary Design <br /> Phase: <br /> 1. Determine Extent of Project. Determine the extent of the Project after consultation with the <br /> City's Representative and on the basis of the approved Study Report. <br /> 2 <br /> Last Revised:4/4/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.