My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with E.L. Pruitt Co. for 2022 Storm Drainage Improvement Project
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with E.L. Pruitt Co. for 2022 Storm Drainage Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:07:44 PM
Creation date
5/4/2022 4:51:10 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-75
Res Ord Title
R2022-75 Resolution Accepting the Bid and Authorizing the Execution of a Contract with E.L. Pruitt Co. for 2022 Storm Drainage Improvement Project
Department
Public Works
Approved Date
5/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADVERTISMENT FOR BIDS <br /> TIME AND PLACE OF OPENING BIDS: <br /> Sealed proposals for the improvement described herein will be received at the City <br /> Purchasing Division located on the first floor of the Civic Center, #1 Gary K. Anderson Plaza, <br /> Decatur, Illinois, 62523, until 10:00 a.m.,April 20, 2022, and thereafter publicly opened and read. <br /> DESCRIPTION OF PROJECT: <br /> The proposed improvement is officially known as: <br /> 2022 STORM DRAINAGE <br /> IMPROVEMENT PROJECT <br /> CITY PROJECT 2022-30 <br /> The proposed project herein specified and described includes the following work: <br /> 1. Country Club Road:Replace approximately 60 foot of 12"Storm Sewer pipe under roadway. <br /> 2. 34'h Street: Replace approximately 55 foot of 30"Storm Sewer pipe under roadway. <br /> 3. Boiling Springs Road:Install Riprap along creek bank underneath and around bridge to control <br /> erosion. <br /> 4. Forest Crest:Replace approximately 55 foot of 36"Storm Sewer pipe under roadway. <br /> 5. Larry Drive:Reshape approximately 825 foot of roadway ditches, install approximately 195 foot of <br /> 12"CMP, and make connections to existing structures and piping. <br /> 6. Woodridge Court:Install approximately 60 foot of 4"Storm Sewer under drain, approximately 50 <br /> foot of 12"Storm Sewer, inlet structure under roadway. <br /> INSTRUCTIONS TO BIDDERS: <br /> 1. A PRE-BID will be held by CONFERENCE CALL ONLY on April 6, 2022, at <br /> 10:00 A.M. In addition to project questions, the opportunity will be provided to <br /> discuss the City's minority participation goals. To join the Conference call, please <br /> call 1-888-450-5996. When prompted please enter the passcode 1.33891. <br /> 2. Plans, specifications and proposal forms may be obtained from Decatur Blue Print, <br /> Inc. 230 West Wood Street, Decatur, Illinois, 62523, (217) 423-7589, <br /> www.decaturblue.com. To receive updates or addenda you must be on the Plan <br /> Holders list for this proiect through Decatur Blue Print. <br /> 3. Payment shall be made to Decatur Blue Print, Inc. No refund will be made for the <br /> plans, specification, or proposal forms returned. <br /> 4. Plans and specifications are available for viewing at the following locations: <br /> www.decaturblue.com City of Decatur <br /> Plans & Portals Engineering Division <br /> Public Projects #1 Gary K. Anderson Plaza <br /> DFS Public Plan Room Decatur, Illinois 62523 <br /> 5. The City of Decatur will not release the Engineer's Estimate of Cost in advance of the <br /> scheduled time and date of the bid opening. Bid tabulations will be available on the <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.