My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-80 Resolution Accepting Bodine Communications Change Order #3 related to the Original Bodine Bid for Underground Fiber Construction of Fiber Extensions, Resolution # R2021-73, to Provide a 2,552 foot City Fiber Extension
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-80 Resolution Accepting Bodine Communications Change Order #3 related to the Original Bodine Bid for Underground Fiber Construction of Fiber Extensions, Resolution # R2021-73, to Provide a 2,552 foot City Fiber Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 9:01:04 AM
Creation date
5/5/2022 9:01:02 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-80
Res Ord Title
R2022-80 Resolution Accepting Bodine Communications Change Order #3 related to the Original Bodine Bid for Underground Fiber Construction of Fiber Extensions, Resolution # R2021-73, to Provide a 2,552 foot City Fiber Extension
Department
Information Tech
Approved Date
5/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> BodineElectric <br /> OF DECATUR <br /> Traffic Division <br /> 1845 North 22nd Street■Post Office Box 976■Decatur,IL 62526 <br /> Phone (217)423.2593■(800)252-3369■Fax(217)420-4275 <br /> April 0.2022 <br /> Project: City of Decatur Fiber- Change Order 0 3-South HGB Development-VA/]CAT <br /> Location: Decatur,IL <br /> Attention: Jim Edwards <br /> Scope of Work <br /> We w ill provide all necessary supervision,labor,materials,and equipment for the successful completion of <br /> the above referenced project as herein specified. <br /> Citv fiber to VA I WAT: <br /> Provide and install 2"duct. <br /> Provide and install fiber marker posts. <br /> Provide and install(4j 24"x 24"quazitc. <br /> Provide and install 144 fibers to quazitc at VA ICAT entrance drive north side. <br /> Fusion splice a new 144 strand fiber into the existing 144 strand at the quazitc on the south side of <br /> Rotary Drive.outside the 911 Center.The number of stands to be fusion splice to be determined_ <br /> City of Decatur to specify which existing fibers to splice onto prior to splice work being <br /> perforated_ <br /> Utilize the existing splicc enclosure in the quazitc outside of the 911 Center.Provide new Splice <br /> Trans to splice the fiber- <br /> Provide and install an Outdoor Rated Splice Enclosure and Splice Tray to dead end the fiber at the <br /> ]CAT campus right-of-way quazitc location. <br /> The new 144 strand fiber will be ran from the existing qtu Ate to a new quazitc at the right-of-way <br /> by the n,-%%ICAT Campus farther south.This fiber will he installed by Bodine Traffic. <br /> Provide OTDR testing of the new fiber to ensure the integrity and functionality of the fibers after <br /> installation. <br /> i Provide all necessary equipment to install and splice the above materials. <br /> Our Price:$111.800.00 Dollars. <br /> Costs for premium wages are not included in this proposal.Our standard working hours are 7:OOAM- <br /> 3:30PM.Monday through Friday excluding holidays. <br /> Use of this quotation is based upon the understanding that Bodine Electric Tmttic Division of Decatur has <br /> necessarily assumed certain conditions in order to arrive at its best estimate for doing the work. In the <br /> event that actual conditions significantly vary from our assumptions.then a fair adjustment to the price is <br /> expected.These include: <br /> Physical conditions significantly different front what could be determined from a <br /> reasonable inspection of the worksite and:or information supplied by customer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.