ARTICLE 10 ARCHITECT
<br /> §10.1 The Architect will provide administration of the Contract as described in the Contract Documents and will be
<br /> an Owner's representative during construction,until the date the Architect issues the final Certificate for Payment.
<br /> The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract
<br /> Documents,unless otherwise modified in writing in accordance with other provisions of the Contract.
<br /> §10.2 Duties,responsibilities,and limitations of authority of the Architect as set forth in the Contract Documents
<br /> shall not be restricted,modified,or extended without written consent of the Owner,Contractor,and Architect.
<br /> Consent shall not be unreasonably withheld.
<br /> §10.3 The Architect will visit the site at intervals appropriate to the stage of the construction to become generally
<br /> familiar with the progress and quality of the portion of the Work completed,and to determine in general,if the Work
<br /> observed is being performed in a manner indicating that the Work,when fully completed,will be in accordance with
<br /> the Contract Documents.However,the Architect will not be required to make exhaustive or continuous on-site
<br /> inspections to check the quality or quantity of the Work.The Architect will not have control over,charge of,or
<br /> responsibility for the construction means,methods,techniques,sequences,or procedures,or for safety precautions
<br /> and programs in connection with the Work,since these are solely the Contractor's rights and responsibilities under
<br /> the Contract Documents.
<br /> §10A On the basis of the site visits,the Architect will keep the Owner reasonably informed about the progress and
<br /> quality of the portion of the Work completed,and promptly report to the Owner(1)known deviations from the
<br /> Contract Documents,(2)known deviations from the most recent construction schedule submitted by the Contractor,
<br /> and(3)defects and deficiencies observed in the Work.The Architect will not be responsible for the Contractor's
<br /> failure to perform the Work in accordance with the requirements of the Contract Documents.The Architect will not
<br /> have control over or charge of and will not be responsible for acts or omissions of the Contractor,Subcontractors,or
<br /> their agents or employees,or any other persons or entities performing portions of the Work.
<br /> §10.5 Based on the Architect's evaluations of the Work and of the Contractor's Applications for Payment,the
<br /> Architect will review and certify the amounts due the Contractor and will issue Certificates for Payment in such
<br /> amounts.
<br /> §10.6 The Architect has authority to reject Work that does not conform to the Contract Documents and to require
<br /> inspection or testing of the Work.
<br /> §10.7 The Architect will review and approve or take other appropriate action upon,the Contractor's submittals such
<br /> as Shop Drawings,Product Data,and Samples,but only for the limited purpose of checking for conformance with
<br /> information given and the design concept expressed in the Contract Documents.
<br /> §10.8 The Architect will interpret and decide matters concerning performance under,and requirements of,the
<br /> Contract Documents on written request of either the Owner or Contractor.The Architect will make initial decisions
<br /> on all claims,disputes,and other matters in question between the Owner and Contractor but will not be liable for
<br /> results of any interpretations or decisions rendered in good faith.
<br /> §10.9 The Architect's decisions on matters relating to aesthetic effect will be final if consistent with the intent
<br /> expressed in the Contract Documents.
<br /> ARTICLE 11 SUBCONTRACTORS
<br /> §11.1 A Subcontractor is a person or entity who has a direct contract with the Contractor to perform a portion of the
<br /> Work at the site.
<br /> §11.2 Unless otherwise stated in the Contract Documents,the Contractor,as soon as practicable after award of the
<br /> Contract,shall notify the Owner and Architect of the Subcontractors or suppliers proposed for each of the principal
<br /> portions of the Work.The Contractor shall not contract with any Subcontractor or supplier to whom the Owner or
<br /> Architect has made reasonable written objection within ten days after receipt of the Contractor's list of
<br /> Subcontractors and suppliers.If the proposed but rejected Subcontractor was reasonably capable of performing the
<br /> Work,the Contract Sum and Contract Time shall be increased or decreased by the difference,if any,occasioned by
<br /> such change,and an appropriate Change Order shall be issued before commencement of the substitute
<br /> Init. AIA Document A1104'-zot7(formerly A107TM -2007) Copyright®1936 1951,1958,1961 1963 1966 1970 1874 1978,1987,1997 2007 and 2017 by
<br /> The American Institute of Architects All rights reserved, <3; f'. 13
<br /> j �f;- .�,.• , s---,,.� This document was produced by AIA software at 17:15:49 CT on 06128/2022 under Order No.2114240266
<br /> which expires on 09/3012022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms
<br /> of Service.To report copyright violations,e-mail c:opyrtght@aia.org.
<br /> User Notes: (3B9ADR43�
<br />
|