My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-88 Resolution Accepting the Bid from Interior Construction Specialty, Inc. for Interior Modifications on the Second Floor of the Decatur Public Library
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-88 Resolution Accepting the Bid from Interior Construction Specialty, Inc. for Interior Modifications on the Second Floor of the Decatur Public Library
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:07:45 PM
Creation date
6/21/2022 4:18:50 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-88
Res Ord Title
R2022-88 Resolution Accepting the Bid from Interior Construction Specialty, Inc. for Interior Modifications on the Second Floor of the Decatur Public Library
Department
City Clerk
Approved Date
6/20/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section Title Date Pages <br /> §6.1.5 The Drawings: <br /> (Either list the Drawings here or refer to an exhibit attached to this Agreement) <br /> The list of d_rawin,s is included in Exhibit A <br /> Number Title Date <br /> §61,6 The Addenda,if any- <br /> Number Date Pages <br /> Addendum I Mai 23.2022 3 pages plus attachments <br /> Portions of Addenda relating to bidding or proposal requirements are not part of the Contract Documents unless the <br /> bidding or proposal requirements are enumerated in this Article 6. <br /> §6.1.7 Additional documents,if any,forming part of the Contract Documents: <br /> 1 Atker-FAbibits: <br /> 1 >dated as indiemed below! <br /> (Ins&4 the dMe efthe 9204 201:7 ineofper-afed We this Agreement.) <br /> Two Date Rages <br /> 9'applementary and other.Ge"tiens of the contfao6 <br /> 8osnerat Title Date Rages <br /> I <br /> .2 Other documents,if any,listed below: <br /> (List here any additional documents that are intended to form part of the Contract Documents) <br /> Exhibit A:Project Manual.dated April 26 2022. <br /> If there is a conflict between the laneuage in this aereement and the contents of Exhibit A,the lan.,wave in Exhibit <br /> A shall t.!yem. <br /> ARTICLE 7 GENERAL PROVISIONS <br /> §7.1 The Contract Documents <br /> The Contract Documents are enumerated in Article 6 and consist of this Agreement(including,if applicable, <br /> Supplementary and other Conditions of the Contract),Drawings,Specifications,Addenda issued prior to the <br /> execution of this Agreement,other documents listed in this Agreement,and Modifications issued after execution of <br /> this Agreement.A Modification is(1)a written amendment to the Contract signed by both parties,(2)a Change <br /> Order,(3)a Construction Change Directive,or(4)a written order for a minor change in the Work issued by the <br /> Architect.The intent of the Contract Documents is to include all items necessary for the proper execution and <br /> (nit AIA Document Af04'-2017(formerly A107n -2007) Copyright 01936,1951,1958,1961,1963 1966,1970,1974,1978,1987,1997,2007 and 2017 by <br /> The American institute of Architects All rights reserved. 7 <br /> This document was produced by AIA software at 17:15:49 CT on 0612812022 under Cyder No.2114240266 <br /> t which expires on 09/3012022,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Doeumentsc Terms <br /> of Service.To report copyright violations,e-mail copyright@aia.org. <br /> User Notes: (369ADA43) <br />
The URL can be used to link to this page
Your browser does not support the video tag.