My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-107 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Microsurfacing Contractors, LLC City Project 2022-24
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-107 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Microsurfacing Contractors, LLC City Project 2022-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:14 PM
Creation date
7/6/2022 4:05:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-107
Res Ord Title
R2022-107 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Microsurfacing Contractors, LLC City Project 2022-24
Department
Public Works
Approved Date
7/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor's yard or another job and the cost to re-mobilize, whichever is less. <br /> Rental equipment may be paid for longer than two weeks provided the Contractor ' <br /> presents adequate support to the Department (including lease agreement) to show <br /> retaining equipment on the job is the most economical course to follow and in the <br /> public interest. <br /> (3) Reduced Rate of Production Delay. The Contractor will be compensated for the <br /> reduced productivity for labor and equipment time in excess of the 25 percent <br /> threshold for that portion of the delay in excess of seven calendar days. , <br /> Determination of compensation will be in accordance with Article 104.02, except <br /> labor and material additives will not be permitted. <br /> Payment for escalated material costs, escalated labor costs, extended project overhead, <br /> and extended traffic control will be determined according to Article 109.13." <br /> Revise Article 108.04(b) of the Standard Specifications to read: <br /> "(b) No working day will be charged under the following conditions. <br /> (1) When adverse weather prevents work on the controlling item. <br /> (2) When job conditions due to recent weather prevent work on the controlling item. , <br /> (3) When conduct or lack of conduct by the Department or its consultants, <br /> representatives, officers, agents, or employees; delay by the Department in making ' <br /> the site available; or delay in furnishing any items required to be furnished to the <br /> Contractor by the Department prevents work on the controlling item. <br /> (4) When delays caused by utility or railroad adjustments prevent work on the controlling <br /> item. <br /> (5) When strikes, lock-outs, extraordinary delays in transportation, or inability to procure <br /> critical materials prevent work on the controlling item, as long as these delays are not <br /> due to any fault of the Contractor. <br /> (6) When any condition over which the Contractor has no control prevents work on the <br /> controlling item." <br /> Revise Article 109.09(f) of the Standard Specifications to read: , <br /> "(f) Basis of Payment. After resolution of a claim in favor of the Contractor, any adjustment , <br /> in time required for the work will be made according to Section 108. Any adjustment in <br /> the costs to be paid will be made for direct labor, direct materials, direct equipment, <br /> direct jobsite overhead, direct offsite overhead, and other direct costs allowed by the , <br /> resolution. Adjustments in costs will not be made for interest charges, loss of anticipated <br /> profit, undocumented loss of efficiency, home office overhead and unabsorbed overhead <br />
The URL can be used to link to this page
Your browser does not support the video tag.