Laserfiche WebLink
ATTACHMENT A <br /> Raw Water Supply Agreement <br /> Schedule A <br /> Lake Improvement Work(Completed& Future) <br /> Year Completed <br /> 2001 DeWitt Wellfield Improvements <br /> 2001 DeWitt Well Field Pump Rehabilitation <br /> 2001 ISWS Basin 6 Sediment Survey <br /> 2003 DeWitt Well Field Follow-Up Study <br /> 2003 Finley Creek Resource Plan <br /> 2003 Mahomet Aquifer Characteristics&Delineation Study <br /> 2004 Off Stream Storage Reservoir Study <br /> 2004 Vulcan West Gravel Pit Water Supply Improvements <br /> 2005 ISWS Entire Lake Sediment Survey <br /> 2005 ISWS Lake Volume Analysis <br /> 2007 DeWitt Wellfield Optimization Study <br /> 2009 Lake Decatur Basin 6 Dredging and Additional Water Supply Capital <br /> Costs <br /> 2009 Lake Decatur Basin 6 Dredging Capital Costs <br /> 2010 Lake Decatur Basin 6 Dredging By Contractor <br /> 2010 Lake Decatur Basin 6 Dredging By Contractor Engineering Services <br /> 2010 Lake Decatur Basin 6 Dredging Operating& Maintenance Costs <br /> 2010 MCSWCD Big and Long Creek Subwatershed Capital Improvement <br /> Proiects <br /> 2020 Lake Decatur Basins I through 4 Dredging and Bond Indebtedness <br /> Lake Improvement Work (Current) <br /> Cisco Well—Electricity <br /> DeWitt Wellfield—Consultant <br /> DeWitt Wellfield- Diesel Fuel <br /> DeWitt Wellfield—Electricity <br /> DeWitt Wellfield—Oil <br /> DeWitt Wellfield - Work performed on City owned wells-Contractor <br /> DeWitt Wellfield - Work performed on private wells impacted by wellfield use - <br /> Contractor <br /> Emergency Shallow Wells—Consultant Services <br /> Emergency Shallow Wells—Contractor <br /> Lake Decatur Basin 1 Dredging and Additional Water Supply- Consultant <br /> Lake Decatur Basin 6 Dredging—Bond Debt Service <br /> Lake Decatur Dredging/New Lake Capital Costs- Water Supply Study <br />