Laserfiche WebLink
CHANGE ORDER <br /> Performance Contract dated March 20th,2020 between Change Order No. 1 Date(mo/day/yr) <br /> Johnson Controls, Inc.and Customer 9/19/2022 <br /> Customer <br /> City of Decatur <br /> The above referenced Performance Contract is hereby modified to the extent described below in accordance with the <br /> Terms and Conditions of the CHANGE ORDERS section thereof. <br /> Scope of Work changed as follows: <br /> ECM-1 Clinic Section#1,Heating and Building Controls <br /> 1) Provide VAV Boxes to Mechanical Contractor for installation. <br /> 2) VAV Boxes to include factory installed controls. Includes VAV-1,VAV-2,FPVAV-3,VAV-4,VAV-5 thru VAV 10 <br /> 3) Provide VAV Reheat Coil control valves to Mechanical Contractor for installation <br /> 4) Provide and install temperature Controls for ten (10) VAV boxes including new thermostats, transformers, <br /> controllers and associated low voltage wiring. Note: no thermostat for air valves,these will be set for constant <br /> volume airflow. <br /> 5) Install network bus to communicate all available points to the BAS including graphics. <br /> 6) Provide field time to assist air balancer for balancing of each VAV box. <br /> 7) Provide startup and validation of all points <br /> ECM-2 Everside Health Section 2: <br /> 1) Provide VAV-RH Boxes to Mechanical Contractor for installation. VAV-RH Boxes to include factory installed <br /> controls. Includes VAV-11 through VAV-12. <br /> 2) Provide Vav Reheat Coil control valves to Mechanical Contractor for installation <br /> 3) Provide and install temperature Controls for two (2) VAV boxes, including new thermostats, transformers, <br /> controllers and associated low voltage wiring. <br /> 4) Install network bus to communicate all available points to the BAS including graphics. <br /> 5) Provide field time to assist air balancer for balancing of each VAV-RH box. <br /> 6) Provide startup and validation of all points <br /> Total amount of this Change Order............................................................ <br /> $ 89,678.00 <br /> Total Performance Contract amount as revised by this Change Order....................... $ 703,135 <br /> Performance Contract(Rev 15) <br /> Johnson Controls,Inc.—Proprietary <br /> ®2008 Johnson Controls,Inc. <br /> 1 <br />