Laserfiche WebLink
Exhibit B <br /> Article 2. Inspection,Testing,Authorization,and Right of Access <br /> 2.1 Equipment Testing and Inspection <br /> The interconnection customer shall test and inspect its distributed generation facility <br /> including the interconnection equipment prior to interconnection in accordance with <br /> IEEE Standard 1547 (2003)and IEEE Standard 1547.1 (2005).The interconnection <br /> customer shall not operate its distributed generation facility in parallel with the EDC's <br /> electric distribution system without prior written authorization by the EDC as provided <br /> for in Articles 2.1.1-2.1.3. <br /> 2.1.1 The EDC shall perform a witness test after construction of the <br /> distributed generation facility is completed,but before parallel operation,unless <br /> the EDC specifically waives the witness test. The interconnection customer shall <br /> provide the EDC at least 15 business day notice of the planned commissioning <br /> test for the distributed generation facility.If the EDC performs a witness test at a <br /> time that is not concurrent with the commissioning test,it shall contact the <br /> interconnection customer to schedule the witness test at a mutually agreeable time <br /> within 10 business days after the scheduled commissioning test designated on the <br /> application. If the EDC does not perform the witness test within 10 business days <br /> after the commissioning test,the witness test is deemed waived unless the Parties <br /> mutually agree to extend the date for scheduling the witness test,or unless the <br /> EDC cannot do so for good cause,in which case,the Parties shall agree to another <br /> date for scheduling the test within 10 business days after the original scheduled <br /> date. If the witness test is not acceptable to the EDC,the interconnection customer <br /> has 30 business days to address and resolve any deficiencies. This time period <br /> may be extended upon agreement between the EDC and the interconnection <br /> customer. If the interconnection customer fails to address and resolve the <br /> deficiencies to the satisfaction of the EDC,the applicable cure provisions of <br /> Article 6.5 shall apply.The interconnection customer shall, if requested by the <br /> EDC,provide a copy of all documentation in its possession regarding testing <br /> conducted pursuant to IEEE Standard 1547.1. <br /> 2.1.2 If the interconnection customer conducts interim testing of the distributed <br /> generation facility prior to the witness test,the interconnection customer shall <br /> obtain permission from the EDC before each occurrence of operating the <br /> distributed generation facility in parallel with the electric distribution system.The <br /> EDC may, at its own expense, send qualified personnel to the distributed <br /> generation facility to observe such interim testing,but it cannot mandate that <br /> these tests be considered in the final witness test.The EDC is not required to <br /> observe the interim testing or precluded from requiring the tests be repeated at the <br /> final witness test. <br /> 2.1.3 After the distributed generation facility passes the witness test,the EDC shall <br /> affix an authorized signature to the certificate of completion and return it to the <br /> interconnection customer approving the interconnection and authorizing parallel <br /> operation. The authorization shall not be conditioned or delayed. <br />