My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:19 PM
Creation date
10/7/2022 9:55:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-163
Res Ord Title
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Department
City Manager
Approved Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> 3.3.6 If the Agreement is terminated,the interconnection customer loses its position in <br /> the interconnection queue. <br /> 3.4 Temporary Disconnection <br /> A Party may temporarily disconnect the distributed generation facility from the electric <br /> distribution system in the event one or more of the following conditions or events occurs: <br /> 3.4.1 Emergency conditions—shall mean any condition or situation: (1)that in the <br /> judgment of the Party making the claim is likely to endanger life or property; or <br /> (2)that the EDC determines is likely to cause an adverse system impact,or is <br /> likely to have a material adverse effect on the EDC's electric distribution system, <br /> interconnection facilities or other facilities,or is likely to interrupt or materially <br /> interfere with the provision of electric utility service to other customers; or(3) <br /> that is likely to cause a material adverse effect on the distributed generation <br /> facility or the interconnection equipment.Under emergency conditions,the EDC <br /> or the interconnection customer may suspend interconnection service and <br /> temporarily disconnect the distributed generation facility from the electric <br /> distribution system. The EDC must notify the interconnection customer when it <br /> becomes aware of any conditions that might affect the interconnection customer's <br /> operation of the distributed generation facility. The interconnection customer shall <br /> notify the EDC when it becomes aware of any condition that might affect the <br /> EDC's electric distribution system. To the extent information is known,the <br /> notification shall describe the condition,the extent of the damage or deficiency, <br /> the expected effect on the operation of both Parties'facilities and operations, its <br /> anticipated duration,and the necessary corrective action. <br /> 3.4.2 Scheduled maintenance, construction,or repair—the EDC may interrupt <br /> interconnection service or curtail the output of the distributed generation facility <br /> and temporarily disconnect the distributed generation facility from the EDC's <br /> electric distribution system when necessary for scheduled maintenance, <br /> construction,or repairs on EDC's electric distribution system. To the extent <br /> possible,the EDC shall provide the interconnection customer with notice five <br /> business days before an interruption. The EDC shall coordinate the reduction or <br /> temporary disconnection with the interconnection customer;however,the <br /> interconnection customer is responsible for out-of-pocket costs incurred by the <br /> EDC for deferring or rescheduling maintenance,construction or repair at the <br /> interconnection customer's request. <br /> 3.4.3 Forced outages—The EDC may suspend interconnection service to repair the <br /> EDC's electric distribution system. The EDC shall provide the interconnection <br /> customer with prior notice, if possible. If prior notice is not possible,the EDC <br /> shall,upon written request,provide the interconnection customer with written <br /> documentation, after the fact, explaining the circumstances of the disconnection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.