My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:19 PM
Creation date
10/7/2022 9:55:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-163
Res Ord Title
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Department
City Manager
Approved Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CXIHSk Nom. <br /> ..... ....... ........ ..........., .._.... _......... T <br /> STANDARD AGREEMENT FOR INTERCONNECTION <br /> OF DISTRIBUTED GENERATION FACILITIES WITH A <br /> CAPACITY LESS THAN OR EQUAL TO 10 MVA <br /> This agreement(together with all attachments,the"Agreement") is made and entered into this 29 <br /> day of April 2022,by and between City of Decatur("interconnection customer"),as a municipal <br /> enti organized and existing under the laws of the State of Illinois and Ameren Illinois <br /> Company, ("Electric Distribution Company"or"EDC"),a corporation existing under the laws of <br /> the State of Illinois. Interconnection customer and EDC each may be referred to as a"Party", or <br /> collectively as the"Parties". <br /> Recitals: <br /> Whereas,interconnection customer is proposing to install or direct the installation of a <br /> distributed generation facility,or is proposing a generating capacity addition to an existing <br /> distributed generation facility, consistent with the interconnection request application form <br /> completed by interconnection customer on 04/21/2022; and <br /> Whereas,the interconnection customer will operate and maintain, or cause the operation and <br /> maintenance of,the distributed generation facility; and <br /> Whereas,interconnection customer desires to interconnect the distributed generation facility <br /> with EDC's electric distribution system. <br /> Now,therefore,in consideration of the premises and mutual covenants set forth in this <br /> Agreement, and other good and valuable consideration,the receipt, sufficiency and adequacy of <br /> which are hereby acknowledged, the Parties covenant and agree as follows: <br /> Article 1. Scope and Limitations of Agreement <br /> 1.1 This Agreement shall be used for all approved interconnection requests for distributed <br /> generation facilities that fall under Levels 2, 3 and 4 according to the procedures set forth <br /> in Part 466 of the Commission's rules (83 Ill. Adm. Code 466) (referred to as the Illinois <br /> Distributed Generation Interconnection Standard). <br /> 1.2 This Agreement governs the terms and conditions under which the distributed generation <br /> facility will interconnect to, and operate in parallel with,the EDC's electric distribution <br /> system. <br /> 1.3 This Agreement does not constitute an agreement to purchase or deliver the <br /> interconnection customer's power. <br />
The URL can be used to link to this page
Your browser does not support the video tag.