Exhibit B <br /> other cause beyond a Party's control. A force majeure event does not include an act of gross <br /> negligence or intentional wrongdoing. <br /> Governmental authority—Any federal, State, local or other governmental regulatory or <br /> administrative agency, court,commission,department,board, other governmental subdivision, <br /> legislature,rulemaking board,tribunal, or other governmental authority having jurisdiction over <br /> the Parties,their respective facilities,or the respective services they provide, and exercising or <br /> entitled to exercise any administrative,executive,police,or taxing authority or power;provided, <br /> however,that this term does not include the interconnection customer,EDC or any affiliate of <br /> either. <br /> IEEE Standard 1547—The Institute of Electrical and Electronics Engineers, Inc. (IEEE),3 <br /> Park Avenue,New York NY 10016-5997, Standard 1547 (2003), "Standard for Interconnecting <br /> Distributed Resources with Electric Power Systems." <br /> IEEE Standard 1547.1—The IEEE Standard 1547.1 (2005), "Conformance Test Procedures for <br /> Equipment Interconnecting Distributed Resources with Electric Power Systems." <br /> Interconnection agreement or Agreement—The agreement between the interconnection <br /> customer and the EDC.The interconnection agreement governs the connection of the distributed <br /> generation facility to the EDC's electric distribution system and the ongoing operation of the <br /> distributed generation facility after it is connected to the EDC's electric distribution system. <br /> Interconnection customer—The entity entering into this Agreement for the purpose of <br /> interconnecting a distributed generation facility to the EDC's electric distribution system. <br /> Interconnection equipment—A group of components or an integrated system connecting an <br /> electric generator with a local electric power system or an electric distribution system that <br /> includes all interface equipment,including switchgear,protective devices, inverters or other <br /> interface devices. Interconnection equipment may be installed as part of an integrated equipment <br /> package that includes a generator or other electric source. <br /> Interconnection facilities—Facilities and equipment required by the EDC to accommodate the <br /> interconnection of a distributed generation facility. Collectively, interconnection facilities <br /> include all facilities, and equipment between the distributed generation facility and the point of <br /> interconnection,including modification,additions, or upgrades that are necessary to physically <br /> and electrically interconnect the distributed generation facility to the electric distribution system. <br /> Interconnection facilities are sole use facilities and do not include distribution upgrades. <br /> Interconnection request—An interconnection customer's request,on the required form, for the <br /> interconnection of a new distributed generation facility, or to increase the capacity or change the <br /> operating characteristics of an existing distributed generation facility that is interconnected with <br /> the EDC's electric distribution system. <br />