|
EXHIBIT B: SUMMARY OF EXPERIENCE
<br /> TRACY M. DORSEY, LEED GREEN ASSOCIATE BRANDON J. MUMMERT, EIT
<br /> Principle Industrial Designer Senior Project Industrial Designer
<br /> V. GANNETT EucArc�N GANNETTDucArlary
<br /> LL'� PEENING BS,Industrial Engineering, � BS,Industrial Engineering,
<br /> g h, FLEMING g g
<br /> University of Pittsburgh, West Virginia University,
<br /> 1985 2008
<br /> CREDENTIALS ,
<br /> EIT:Pennsylvania-No.
<br /> ET021596(2015)
<br /> Principal Industrial Designer responsible for development of Industrial Designer responsible for developing facility require-
<br /> facility requirements;analysis of material flow and layout of ments;analyzing material flow and layout of vehicle maintenance,
<br /> maintenance,parts storage,and yard areas;and specification of parts storage,and yard areas;preparing equipment specifications
<br /> shop equipment for vehicle maintenance and industrial facilities. for vehicle maintenance and industrial facilities;and provid-
<br /> Conducts studies of manufacturing,maintenance,warehousing, ing technical assistance in completing contract bid package
<br /> and yard operations and develops improvements through the preparation.
<br /> use of efficient methods,labor-saving equipment,computerized
<br /> systems,and automation. PROJECT EXPERIENCE
<br /> • METRO New Central Bus Maintenance Facility,Akron,OH
<br /> PROJECT EXPERIENCE
<br /> - COTA McKinley Ave Garage Renovation(Phase 3C),
<br /> • METRO New Central Bus Maintenance Facility,Akron,OH Columbus,OH
<br /> • New Northern Bus Maintenance Facility,Newark,NJ General Architectural and Engineering Consultant(GEC)
<br /> • Laketran Headquarters Renovations and Expansion, On-Call Design Services,Various Locations,DC,MD,and
<br /> Painesville,OH VA
<br /> • COTA McKinley Ave Garage Renovation(Phase 3C), Howell Bus Facility Upgrade,Howell,NJ
<br /> Columbus,OH Design Services for Condition Assessment and
<br /> • COTA Fields Ave Garage Renovation,Columbus,OH Prioritization of Repair for Maintenance Facilities,NJ
<br /> • New Greyhound Bus Maintenance Facility,Chicago,IL Conceptual Design of a Prefabricated Building for
<br /> • Bus Rapid Transit System,Pittsburgh,PA the Major Repair of Compressed Natural Gas(CNG),
<br /> Gasoline,and Diesel Vehicles,Athens,PA
<br /> • On-Call General Architectural and Engineering
<br /> Consulting Services,Bladensburg Reconfiguration
<br /> Project,Washington,DC
<br /> • Bus Operations and Maintenance Facility Architectural
<br /> and Engineering Design Improvements and
<br /> Environmental Services,Allentown,PA
<br /> PROPOSAL FOR ARCHITECTURAL SERVICES I DECATUR TRANSIT MASTER PLAN Bowen
<br /> CI CY OF DECATUR,ILLINOIS is
<br />
|