Laserfiche WebLink
SA 2243 - EXHIBIT B, <br /> Clinton St Page 3 <br /> Decatur, IL 22-1607 <br /> LABOR <br /> SIGNAL LABOR <br /> Item Gang Days Cost/Day Cost <br /> 6-man Gang 15 $ 3,500.00 $ 52,500.00 <br /> SUBTOTAL SIGNAL LABOR $ 52,500.00 <br /> MISCELLANEOUS LABOR <br /> Item Quantity Units Unit Cost Cost <br /> Preliminary Engineering 1 L.S. $ 2,500.00 $ 2,500.00 <br /> Construction Engineering 1 L.S. $ 2,500.00 $ 2,500.00 <br /> Accounting 1 L.S. $ 200.00 $ 200.00 <br /> SUBTOTAL MISCELLANEOUS LABOR $ 5,200.00 <br /> TOTAL LABOR $ 57,700.00 <br /> OTHER <br /> Item Quantity Units Unit Cost Cost <br /> Contractor/Rented Equipment 1 L.S. $ 9,375.00 $ 9,375.00 <br /> Directional Boring (By Others) 500 FT $ 41.00 $ 20,500.00 <br /> Power Service,AC 1 L.S. $ 30,000.00 $ 30,000.00 <br /> Freight on Crossing Package 1 L.S. $ 6,000.00 $ 6,000.00 <br /> Construction Engineering (Contracted) 1 L.S. $ 11,000.00 $ 11,000.00 <br /> Per Diem/Business Expense 1 L.S. $ 27,000.00 $ 27,000.00 <br /> Sales Tax on Material 1 L.S. $ 9,489.00 $ 9,489.00 <br /> TOTAL OTHER $ 113,364.00 <br /> TOTAL DIRECT COSTS $ 342,624.00 <br />