My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07 Ordinance Amending City Code Chapter 66 Regulation of Lake Decatur
COD
>
City Clerk
>
ORDINANCES
>
2023
>
2023-07 Ordinance Amending City Code Chapter 66 Regulation of Lake Decatur
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 9:35:36 AM
Creation date
2/28/2023 9:35:30 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2023-07
Res Ord Title
2023-07 Ordinance Amending City Code Chapter 66 Regulation of Lake Decatur
Department
Public Works
Approved Date
2/27/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. U.S. Route 36 Bridge shall mean that bridge which spans the original channel of the <br /> Sangamon River on U.S. Route 36 and in Section 18, Decatur Township, and Section 19, Long <br /> Creek Township, Macon County, Illinois, near Nelson Park, and commonly known as Route 36 <br /> Bridge. <br /> N. U.S. Route 51 Bridge shall mean the bridge which spans the original channel of the <br /> Sangamon River on U.S. Route 51 and in Section 22, Decatur Township, Macon County, Illinois, <br /> and is commonly known as Route 51 Bridge. <br /> O. Watercourse shall mean any stream, channel, or natural or artificial spring of any kind <br /> in which water flows continuously or intermittently over any part of the drainage area into any part <br /> of the reservoir directly or indirectly. <br /> P. William Street Bridge shall mean that bridge which spans the original channel of the <br /> Sangamon River on U.S. Route 105 and in Section 8, Decatur Township, Macon County, Illinois, <br /> and is commonly known as the William Street Bridge. <br /> (Amended, Ordinance 2017-05, February 6, 2017) <br /> 2. ZONES DEFINED. <br /> A. Zone A shall consist of all land lying within the high water mark or below the high <br /> water mark,in the reservoir site,whether flooded or not. This zone includes tributary watercourses <br /> upstream to the aforesaid high water mark. <br /> B. Zone B shall consist of that portion of the drainage area within 100 feet of the high <br /> water mark around the reservoir and within the same distance of said high water mark of any of <br /> its tributaries extending upstream (following the channel of the stream) and a distance of one-half <br /> mile from the high water mark upstream of said tributaries, and shall include at certain places all <br />
The URL can be used to link to this page
Your browser does not support the video tag.