My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-31 Resolution Authorizing a Water Tank Maintenance Cost Extension with Utility Service Company, Inc., for the Division Street Elevated Water Tank
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-31 Resolution Authorizing a Water Tank Maintenance Cost Extension with Utility Service Company, Inc., for the Division Street Elevated Water Tank
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 12:22:04 PM
Creation date
2/28/2023 12:21:55 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-31
Res Ord Title
R2023-31 Resolution Authorizing a Water Tank Maintenance Cost Extension with Utility Service Company, Inc., for the Division Street Elevated Water Tank
Department
Public Works
Approved Date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/17/23,8:22 AM Item Coversheet <br /> in <br /> Public Works <br /> DATE: 2/10/2023 <br /> MEMO: 2023-17 <br /> TO: Honorable Mayor Julie Moore Wolfe and City Council Members <br /> FROM: Jon Kindseth,Deputy City Manager <br /> Matt Newell,Public Works Director <br /> Randy Miller,Water Services Manager <br /> SUBJECT: <br /> Resolution Authorizing A Water Tank Maintenance Cost Extension with Utility Service Company,Inc.,for the Division <br /> Street Elevated Water Tank <br /> SUMMARY RECOMMENDATION: <br /> Staff recommends that the City Council approve the following: <br /> 1.Resolution authorizing a 6-year cost extension of the Water Tank Maintenance Contract for the Division Street Elevated Water <br /> Tank with Utility Service Co.,Inc.,a subsidiary of Veolia North America,through December 31,2028. The total fee is <br /> $356,551.23. <br /> 2.Resolution authorizing a 6-year cost extension of the Water Tank Maintenance Contract for the Garfield Avenue Elevated Water <br /> Tank with Utility Service Co.,Inc.,a subsidiary of Veolia North America,through December 31,2028.The total fee is <br /> $501,502.14. <br /> BACKGROUND: <br /> The City owns three elevated steel water tanks: East Garfield Avenue(1,500,000 gallons),West Division Street(1,000,000 <br /> gallons),and a composite steel/concrete elevated tank on South Franklin Street Road(1,000,000 gallons). These tanks contain <br /> millions of gallons of potable water and are necessary components of the water distribution system for maintaining water pressure, <br /> needed water volume during peak water demand and for emergencies such as firefighting water demand. <br /> Garfield and Division Water Tanks <br /> In 2008,the City entered into long term maintenance agreements with USC for the Garfield and Division elevated water tanks. <br /> USC is the nationwide leader of water asset maintenance programs,including water tanks. These agreements with water tank <br /> maintenance experts have been very beneficial in improving the overall condition of the City's vital water tank assets. Over the <br /> past 13 years,the exterior on both tanks have been painted twice and the interior in each tank have been painted once. Both tanks <br /> are inspected every year and the interior of the tanks are chemically cleaned and inspected every 3 years. <br /> Back in 2008,both tanks needed significant maintenance and had not been painted since 1990. Water Management staff contacted <br /> Utility Service Co.,to submit maintenance contracts for consideration.At the time,Utility Service Co.was the largest water tank <br /> service provider in the United States,with approximately 5,000 tanks under contract. City staff contacted several Utility Service <br /> Co.customers,all of which reported high satisfaction with their maintenance contracts. The City has greatly benefited by having <br /> its elevated water tanks under regular maintenance contracts for all the periodic maintenance and inspection activities that these <br /> water tanks require. <br /> Franklin Street Water Tank <br /> In 2021,the City entered into long term maintenance agreement with USC for the Franklin Street Water Tank.The Franklin Street <br /> Elevated Water Tank was constructed in 2011 and is the newest water tank asset in the City's water utility. It was constructed to <br /> maintain reliable water pressure to the City's water customers south of Lake Decatur and to add more water storage to the City's <br /> water system. The area south of the Lake is in a separate pressure zone than the rest of the City. The Franklin Tank is a critical <br /> component of the south water pressure zone which includes Mt.Zion customers and the Fuyao Glass Plant on Elwin Road. The <br /> Franklin Street Tank has been in service for 12 years and is still in good condition. <br /> https://decatur.novusagenda.com/agendaweb/CoverSheet.aspx?ItemID=4245 1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.