Schedule A <br /> Renovation Specifications <br /> Exterior <br /> 1. All exterior surfaces must be pressure washed with a minimum of 4,000 P.S.I. washer to remove any <br /> surface contamination. <br /> 2. All rusted areas must be Hand/Power tool cleaned per SSPC-SP2. SP3 cleaning methods. <br /> 3. All rusted or bare areas must be spot primed with a rust inhibitive metal primer. <br /> 4. One (1) full intermediate coat of a Tnemec compatible Series coating shall be applied to complete exterior <br /> surfaces(100%). <br /> 5. One (1) full finish coat of a Tnemec compatible Series coating shall be applied to complete exterior <br /> surfaces(100%). <br /> 6. Apply logos. <br /> Interior <br /> I. The complete interior(100%)shall be abrasive blast cleaned to SSPC-SP No. 10"Near White" finish. <br /> 2. After abrasive cleaning,all surfaces shall be cleaned of any dust residue or foreign debris. <br /> 3. A high build epoxy liner manufactured by the Tnemec Company shall be applied as follows: <br /> a. Prinner Cour: One [I J complete coat of Tnemec Series 20 Epoxy or equivalent shall be applied to <br /> achieve a dry film thickness of 3 to 5 mils. <br /> Finish Coat: One [I J complete finish coat of Tnemec Series 20 Epoxy or equivalent shall be <br /> applied to achieve a dry film thickness of 4 to 6 mils. <br /> b. Contrasting Color: Each coat of epoxy paint shall be of contrasting color. <br /> c. Swipe Cout: One additional coat of epoxy shall be applied by brush and roller to all weld seams. <br /> d. Caulk Seams: All roof seams shall be sealed and caulked. <br /> 4. After the liner has properly cured,the interior surfaces shall be disinfected per A.W.W.A. Spray Method <br /> No.2(200 PPM). <br /> 5. The spent abrasive media shall be tested per TCLP-(8) Heavy Metals as mandated by the State. <br /> 6. Once the tests results confirm the non-hazardous status of the wastes, the spent abrasive shall be disposed of <br /> properly. <br /> 7. The Tank shall be sealed and made ready for service. <br /> Repairs <br /> I. Install access ladder safety climb 14. Fill pitting on wet interior steel <br /> 2. Install overflow screen 15. Install roof railing <br /> 3. Install interior ladder <br /> 4. Install bolted riser manway <br /> 5. Install overflow flapper <br /> 6. Install round roof hatch <br /> 7. Install grease seals on anchor chairs <br /> 8. Replace cover on electrical box near ladder <br /> 9. SSPC#2/3,apply 2 coats to all pit piping. <br /> 10. Replace sidewall ladder with vertical ladder, platform with handrails,and safety climb. <br /> II. Repair Overflow Support tabs <br /> 12. Install a screen on the floor drain <br /> 13. Install hatch style cover over balcony opening <br /> Page 6 of 6 <br /> ©2007 Utility Service Co., Inc. <br /> Rev.04/07 <br />